My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-07-22 PC Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2022
>
12-07-22 PC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2022 3:31:50 PM
Creation date
12/5/2022 3:29:56 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Buildable area per zoning <br />•Irregular lot shape causes 40’ front setback to be applied on north and northeast sides, greatly reducing buildable lot area <br />•Current home is nonconforming (25’ front setback) <br />•Need to maintain existing driveway location and grade <br />•Low elevation in south part of lot would restrict basement due to lake ordinary high waterheight <br />•Greater OHW setback required due to adjacent lot dwelling setback <br />•Large mature trees restrict home placement options <br />•Guidance to allow 20’ clearance from foundation during construction <br />•One large cottonwood will be removed <br />13
The URL can be used to link to this page
Your browser does not support the video tag.