Laserfiche WebLink
Capital Improvement Plan 2023 thru 2027 Department Surface Water Management D <br />City of Arden Hills, Minnesota Contact Public Works Director <br />Project # 23-Storm-001 Type Improvement <br />Useful Life 20 <br />Project Name Karth Lake retainingwall <br />Category Storm Water Maintenance <br />TCAAP No Priority 2 Very Important <br />Description Total Project Cost: $100,000 <br />teplace failing retaining wall adjacent to the west bank of Karth Lake at the lake outlet pump. Staff will investigate alternatives, including <br />epair/replacement of wall and removal of wall with bank stabilization measures. Short term repairs will be made to redirect drainage from being <br />:onveyed over the top of the wall. <br />Justification <br />?xisting retaining wall is in need of repairs. <br />Expenditures 2023 2024 2025 2026 2027 Total <br />Construction/Maintenance 100,000 100,000 <br />Total 100,000 <br />100,000 <br />Funding Sources 2023 2024 2025 2026 2027 Total <br />Surface Water Mgmt Utility 100,000 100,000 <br />Funds <br />Total 100,000 <br />erosion and address park safety issues. <br />100,000 <br />Produced Using the Plan -It Capital Planning Software <br />