Laserfiche WebLink
Capital Improvement Plan 2023 thru 2027 Department Surface Water Management D <br />City of Arden Hills, Minnesota Contact Public Works Director <br />Project # 24-Storm-001 Type Maintenance <br />Useful Life 20-25 <br />Project Name Storm Pond and Outfall Maintenance Category Storm Water Maintenance <br />TCAAP No Priority 2 Very Important <br />Description Total Project Cost: $610,000 <br />This project is the first phase of a program to address accumulated sediment within stormwater ponds in the City's drainage system to maintain <br />system compliance with State MS4 requirements. Staff measured sediment accumulation in several ponds in 2019/2020 and identified the Benton <br />Way pond in 2024 ($300,000) and the Glen Arden pond in 2026 ($200,000) as the higher priority maintenance locations within the drainage <br />Justification <br />Maintenance is required by the City's MS4 permit issued by the MPCA. <br />Expenditures 2023 2024 2025 2026 2027 Total <br />Construction/Maintenance 300,000 200,000 500,000 <br />Total 300,000 200,000 500,000 <br />Funding Sources 2023 2024 2025 2026 2027 Total <br />Surface Water Mgmt Utility 300,000 200,000 500,000 <br />Funds <br />Total <br />300,000 <br />200,000 <br />500,000 <br />Produced Using the Plan -It Capital Planning Software <br />