Laserfiche WebLink
Capital Improvement Plan 2023 thru 2027 Department Water Department <br />City of Arden Hills, Minnesota Contact Public Works Director <br />Project # 26-W-002 Type Unassigned <br />Useful Life 30 <br />Project Name MN-51 Watermain Crossing Improvements Category Utility Maintenance <br />TCAAP No Priority 3Important <br />Description Total Project Cost: $190,000 <br />'roposed replacement of watermain crossings along MN-51 at Glenhill Road (8-inch CIP), between Cummings Lane and Ingerson Road (8-inch <br />IP), and near Red Fox Road (I2-inchCIP). New watermain will consist of DIP or PVC. <br />Justification <br />Che existing watermain material is CIP and over 50 years old. CIP is more prone to breaks as it ages compared to DIP or PVC. These crossings <br />ire vital to supplying consistent water distribution on each side of MN-51. MnDOT is scheduled to resurface MN-51 in 2026. <br />Expenditures 2023 <br />2024 2025 2026 2027 <br />Total <br />Construction/Maintenance <br />190,000 <br />190,000 <br />Total <br />Funding Sources 2023 <br />190,000 <br />2024 2025 2026 2027 <br />190,000 <br />Total <br />Water Utility Funds <br />190,000 <br />190,000 <br />Total <br />190,000 <br />190,000 <br />Budget Impact/Other <br />Produced Using the Plan -It Capital Planning Software <br />