My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-19-22-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
12-19-22-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2022 1:08:28 PM
Creation date
12/15/2022 1:05:48 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.25 <br />14.26 <br />14.27 <br />14.28 <br />15 <br />15.1 <br />15.2 <br />15.3 <br />15.4 <br />15.5 <br />16 <br />16.1 <br />16.3 <br />16.4 <br />17 <br />17.1 <br />17.2 <br />18 <br />18.1 <br />18.2 <br />18.3 <br />19 <br />19.1 <br />19.2 <br />20 <br />20.1 <br />20.2 <br />20.3 <br />20.4 <br />20.5 <br />Alternator 60 months 300,000 miles <br />$ <br />231.00 <br />$ <br />- <br />Starter & Alternator 60 months 300,000 miles <br />$ <br />315.00 <br />$ <br />For Prebuild and Pilot meets See RFP special Terms and <br />conditions <br />Prebuild specification meeting (per person) to be held in St. <br />Paul/Minneapolis area. <br />Pilot inspection meeting (per person). <br />TRAILER TOW OPTIONS: <br />Trailer tow package extended to rear of frame <br />$ <br />$ <br />$ <br />1.00 <br />900.00 <br />317.00 <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />Trailer package extend to rear of frame per Spec 12.12 <br />$ <br />417.00 <br />$ <br />- <br />Single 7 pin SAE type, end of frame <br />1 <br />$ <br />117.00 <br />$ <br />117.00 <br />Dual 7 pins standard SAE type, end of frame (1) for trailer with <br />electric brakes, (1) for trailer with air brakes <br />$ <br />158.00 <br />$ <br />- <br />Hand control valve for trailer brakes <br />$ <br />47.00 <br />$ <br />- <br />MANUALS / INTEREST FEE: <br />Percent interest per month (non -compounding) on unpaid cab & <br />chassis balance. Applies only to CPV Members. (Payable after trade- <br />in is delivered to vendor). Percentage/per month. <br />SEE Special Terms and Conditions re interest to State agencies. <br />Manuals in CD form, parts repair and service, per set <br />Premium Tech Tool <br />Delivery Charges: <br />Price per loaded mile List starting point <br />Roseville, MN 55113 <br />Maintenance /Body Shop Repair Rate <br />Rate for initial Inspection/Diagnostics <br />Rate for Mechanical Work <br />Rate for Body Work <br />Quantity Discounts: <br />Enter the number of units that must be purchased and the <br />corresponding discount offered to the purchaser. More than one <br />quantity discount may be entered. <br />Next Model Year Upcharges <br />Enter the following Production Model Year here »»»»> <br />Percentage Upcharge for the following Model Year: 2023MY <br />Percentage Upcharge for the following Model Year: 2024MY <br />2023MY Shipping Surcharge <br />2023MY Material Surcharges <br />2024MY Material Surcharge <br />1 <br />1 <br />1 <br />1 <br />1 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />1.50 <br />500.00 <br />3,800.00 <br />2.00 <br />167.00 <br />167.00 <br />167.00 <br />2024 <br />1.50% <br />1.50% <br />250.00 <br />7,500.00 <br />4,000.00 <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />_ <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />- <br />$ <br />1,647.95 <br />$ <br />1,647.95 <br />$ <br />250.00 <br />$ <br />7,500.00 <br />$ <br />4,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.