My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2001 PTRC Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2001
>
09-25-2001 PTRC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:25:47 AM
Creation date
12/29/2022 2:48:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' OCT-30-2001 09: 11A FROM:INGRAHAM & ASSOCIATE 612 377 2500 TO:65163,15137 P:2-1 <br /> Arden Hills Park, Trail and Open Space Plan <br /> DRAFT RECOMMENDATION - 10/29/01 <br /> Priorities and Implementation Recommendations 2001-2005 <br /> Trails— <br /> Round Lake Trail—Get remaining easements and complete the trail along west Round <br /> Lake. <br /> Railroad Bridge Crossing over I-35W. Work with MNDOT and the Railroad to utilize <br /> existing railroad bridge for a trail crossing over the interstate. (ISTEA Grant, funding <br /> from Arden Hills, New Brighton and Ramsey County) <br /> Continue to lobby for a railroad underpass between Tony Schmidt and Perry Park (work <br /> with County and railroad) Use local leverage in negotiations between County and <br /> railroad. . $0-staff and committee time <br /> Charles Perry Park—Add a N-S trail connection with the County(pending County acq. of <br /> underpasss) from the railroad to Mounds View High School. Add a trail connection from <br /> parking lot to pump house. $20,000 <br /> • Lobby for a pedestrian/bike bridge/lanes over TH51 at County Road E. Work with <br /> County and State. Get this on their priority list. . $0 - staff and committee time <br /> Get the trail along County E built from Snelling to east of Hamline Ave. (County <br /> project). $ ?city share if any of trail construction. <br /> Make trails connections at Cleveland Ave. south to Roseville and from Tony Schmidt to <br /> the diagonal trail (trail should be named)through Sampson and Hazelnut Parks. $40,000 <br /> Connect Crepeau Park to County Road E trail along Pine Tree Drive. $30,000 <br /> Park Renovation— <br /> Add new park and trail signage at all parks and trails,have park and trail system maps <br /> installed at key outdoor locations, and available at City Hall. $17,500 <br /> Install ADA access upgrades(seek MnDNR grants) Connect park features with a paved <br /> trails at Arden Oaks, Floral,Hazelnut, Ingerson, and Valentine Parks. $125,000 <br /> Charles Perry Park - Relocate access drive and build new warming house. $135,000. <br /> Freeway Park— Add a parking lot. $25,000. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.