My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-2022 PTRC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2002
>
01-22-2022 PTRC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 4:55:29 PM
Creation date
1/12/2023 3:24:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail Surfacing <br /> •The choice of trail surface (i.e. bituminous, wood chips, mowed turf, gravel, etc.) affects use of the <br /> trail, cost of trail construction, trail character, aesthetics and trail maintenance. Arden Hills residents <br /> want a variety of trail surfaces. Based on responses to the public opinion survey, paved trails are the <br /> most popular trail surface, although there is considerable interest in non-paved surfaces (401 paved <br /> responses to 351 non-paved responses). The City should balance paved and unpaved trail surfacing. <br /> Trails along roads and trails making cross community or inter-city connections should be paved as <br /> should major loop or access paths within larger parks. Trails within natural areas and secondary <br /> trailsshould have a more natural surface (ag-lime, gravel, wood chip or mowed turf). The Arden Hills <br /> Park and Trail Plan(Figure D) and the individual park renovation maps show the recommended trail <br /> locations and surface type. <br /> Trail Maintenance and Replacement <br /> Due to increased use, interest and expansion of trails, there is a need for a comprehensive trail main- <br /> tenance and replacement plan. This plan would include annual maintenance (crack sealing, plowing <br /> etc.) and scheduled pavement replacement. Winter walking is popular and there is more demand for <br /> snow plowing of trails during the winter. Equipment is needed to allow plowing of trails for winter <br /> use. <br /> Park and Trail Signs and Iden <br /> tification <br /> Trail identification is needed as none of the trails in the City have names. Individual trails within the <br /> City should be given names and mile markers to help users find their way and assist with directions. <br /> This may also help the City with maintenance and response to emergency situations. <br /> New park signage is also needed. Exist- <br /> ing non-existent. A common sign design <br /> should be developed and consistent park <br /> and trail identification signs should be <br /> placed in the parks and along trail corri- <br /> dors. <br /> A park and trail system map was devel- <br /> oped as part of the planning process. This <br /> map should be reproduced on weather and <br /> vandal resistant materials and displayed in <br /> the City parks and at major trail entrances. <br /> An overall park and trail map will help <br /> residents find parks and trails and connect <br /> neighborhoods. Many residents are <br /> unaware of the existing park and trails in <br /> Arden Hills. This map could also be <br /> copied as a handout guide for interested <br /> Freeway Park <br /> citizens. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.