My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-2022 PTRC Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2002
>
01-22-2022 PTRC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2024 4:55:29 PM
Creation date
1/12/2023 3:24:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arden Hills should accept cash park dedication in leiu of land for development south of TH96, except <br /> when there is the possibility and need to add land adjacent to existing parks. Park dedication north of <br /> TH96 (TCAAP) should be in accordance with the Vento Re-use Master Plan. • <br /> Because of the developed status of the city, park dedication funds are not anticipated to be a <br /> significant source of additional funding for park and trail improvements. The city may have to rely <br /> more on general funds and other revenues for needed replacement and improvements. <br /> Implementation Recommendations 2002-2006 <br /> The following are the recommended implementation actions recomended to the PTRC. These <br /> projects should be reviewed and adjusted annually. Funding should be secured and actions plans <br /> developed to assure implementation of these projects. <br /> Trails <br /> • Purchase a maintenance vehicle capable of both summer and winter trail maintenance. $95,000. <br /> • Railroad Bridge Crossing over I-35W. Work with MNDOT and the Railroad to utilize existing <br /> railroad bridge for a trail crossing over the interstate. (ISTEA Grant, funding from Arden Hills, <br /> New Brighton and Ramsey County) $ to be determined. <br /> • Continue to lobby for a railroad underpass between Tony Schmidt and Perry Park (work with i <br /> County and railroad) Use local leverage in negotiations between County and railroad. $0 -staff <br /> and committee time. <br /> • Charles Perry Park—Add a N-S trail connection with the County (pending County acquisition of <br /> underpass) from the railroad to Mounds View High School. Add a trail connection from parking <br /> lot to pump house. Replace bridge across wetland opposite Pump House Road. $35,000. <br /> • Lobby for a pedestrian/bike bridge/lanes over TH51 at County Road E. Work with County and <br /> State. Get this on their priority list. $0 - staff and committee time. <br /> • Get the trail along County E built from Old Snelling to east of Hamline Ave. (County project). $ <br /> to be determined. City share if any of trail construction. <br /> • Make trails connections from Tony Schmidt to the diagonal trail(trail should be named) through <br /> Sampson and Hazelnut Parks. $20,000. <br /> • Connect Crepeau Park to County Road E trail along Pine Tree Drive. $30,000. <br /> • Work with MNDOT to get trail crossings of TH96, including a grade separated crossing, to <br /> connect City Hall and TCAAP with the area south of TH96. $ to be determined. City share if <br /> any. <br /> • Work to complete a trail around the south end of Lake Johanna to Lydia Avenue. $ to be deter <br /> mined. <br /> 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.