My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-24-23 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2023
>
01-24-23 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 11:31:51 AM
Creation date
1/23/2023 11:30:56 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agenda Item 3-A <br />�-AIQEN HILLS <br />MEMORANDUM <br />DATE: January 24, 2023 <br />TO: Parks, Trails and Recreation Committee <br />FROM: Lucas Miller, Assistant Public Works Director <br />SUBJECT: Trail Projects Update <br />Background <br />A verbal update will be provided at the meeting. <br />• Lexington Ave will not be completed until early summer 2023 <br />• Safe Routes to School from MVHS to E2 down Lake Valentine Road/Old Highway 10 is <br />scheduled for construction this summer 2023. SRF is preparing documents for bidding <br />currently. Open house took place this fall. There were $450k in grants for this project. <br />• City is working with a consultant to pursue grants for the trail from Lake Valentine Road <br />to Highway 96 along Old Highway 10. Feasibility study has been completed for this <br />project this last fall. Estimated project cost is $2.6 Mil. <br />• Lake Johanna Blvd trail study was completed by Ramsey County and they are pursuing <br />funding currently. They are shooting for a final design in 2028. <br />• Open House dates for Floral and Arden Manor still TBD based on discussions at work <br />session. Public surveys have been collected and presented to Council for consideration <br />for both. (Results of the surveys are attached for both parks for PTRC to review and <br />discuss). Design for both projects are ongoing and construction is slotted for 2023. Arden <br />Manor funding are grants combined with city funding. Floral is city funding. <br />• Annual trail maintenance is being scheduled for summer 2023 along Round Lake Rd, <br />Lexington north of 96, Cummings and Floral Parks. <br />• The CIP for Parks is available online. The budget has been adjusted and will be available <br />when it is approved. <br />Attachment <br />Attachment A — Arden Manor Park Survey Questions and Responses <br />Attachment B — Floral Park Survey Questions and Responses <br />
The URL can be used to link to this page
Your browser does not support the video tag.