Laserfiche WebLink
<br /> Page 13 of 14 <br />6. The proposed buildings shall conform to all other standards and regulations in the <br />City Code. <br />7. A Grading and Erosion permit for each lot shall be obtained from the City’s <br />PW/Engineering Division prior to commencing any grading, land disturbance or <br />utility activities. <br />8. Upon completion of grading and utility work on the site, a grading as-built and utility <br />as-built shall be provided to the City. <br />9. Final grading, drainage, and utility plans shall be subject to approval by the Public <br />Works Director/City Engineer prior to the issuance of a grading and erosion control <br />permit or other development permits. <br />10. Heavy duty silt fence and adequate erosion control around the entire construction site <br />shall be required and maintained by the Applicant during construction to ensure that <br />sediment and storm water does not leave the project site. <br />11. The Applicant shall be responsible for providing verification of approval and <br />obtaining any permit necessary from the Rice Creek Watershed District prior to the <br />start of any site activities. <br />12. A separate right-of-way permit for each lot shall be required for work performed <br />within the City right-of-way. <br />13. The Applicant shall be responsible for obtaining a Sanitary Sewer Connect Permit. <br />14. The Applicant shall be responsible for obtaining a Water Connect Permit. <br />15. Prior to the issuance of a building permit, the Applicant shall be financially <br />responsible for 100 percent of all applicable sewer connection, sewer availability, <br />water connection, water availability and Metropolitan Council SAC charges. <br />16. A Tree Preservation Plan shall be required as part of the Building Permit application <br />for the new dwelling on Tract A and Tract B. Any tree removal, preservation, and <br />mitigation shall be completed in accordance with City Code Section 1325.055. <br />17. Future development on Tract A would be evaluated as presented in Site Plan B <br />designating the north and east elevations as the required front yards. <br />18. Future development on Tract B would be evaluated as presented in Site Plan B <br />designating the north and east elevation as the required front yards. <br />19. The Minor Subdivision shall be required to comply with all applicable provisions of <br />Section 1330, Shoreland Regulations and the Applicant is to submit an updated <br />certificate of survey in satisfaction of these requirements prior to issuance of any <br />building permits for the new home construction on Tract A or B. <br /> <br />• Recommend Approval as Submitted: Motion to recommend approval of Planning Case 23- <br />003 for a Minor Subdivision and Variance as submitted by the Applicant in Site Plan B at <br />1174 Edgewater Avenue, based on the findings of fact and the submitted materials. <br /> <br />• Recommend Denial: Motion to recommend denial Planning Case 23-003 for a Minor <br />Subdivision and Variance as submitted by the Applicant in Site Plan B at 1174 Edgewater <br />Avenue, based on the following findings: findings to deny should specifically reference the <br />reasons for denial and why those reasons cannot be mitigated. <br /> <br />• Table: Motion to table Planning Case 23-003 for a Minor Subdivision and Variance as <br />submitted by the Applicant in Site Plan B at 1174 Edgewater Avenue: a specific reason <br />and information request should be included with a motion to table.