Laserfiche WebLink
Agenda Item 3-A <br /> <br /> <br /> <br /> <br /> <br /> <br />MEMORANDUM <br /> <br />DATE: February 28, 2023 <br /> <br />TO: Parks, Trails and Recreation Committee <br /> <br />FROM: Lucas Miller, Assistant Public Works Director <br /> <br />SUBJECT: Trail Projects Update <br /> <br /> <br />Background <br />A verbal update will be provided at the meeting. <br /> Lexington Ave will not be completed until early summer 2023 <br /> Safe Routes to School from MVHS to E2 down Lake Valentine Road/Old Highway 10 is <br />scheduled for construction this summer 2023. SRF is preparing documents for bidding <br />currently. Open house took place this fall. There were $450k in grants for this project. <br /> City is working with a consultant to pursue grants for the trail from Lake Valentine Road <br />to Highway 96 along Old Highway 10. Feasibility study has been completed for this <br />project this last fall. Estimated project cost is $2.6 Mil. <br /> Lake Johanna Blvd trail study was completed by Ramsey County and they are pursuing <br />funding currently. They are shooting for a final design in 2028. <br /> Open House for Floral and Arden Manor parks took place in early February. There was a <br />great showing from the residents. Public surveys have been collected and presented to <br />Council for consideration for both. Results of the surveys were provided for PTRC to <br />look at last month. Design for both projects are ongoing and construction is slotted for <br />2023. Arden Manor funding are grants combined with city funding. Floral is city funding. <br /> Annual trail maintenance is being scheduled for summer 2023 along Round Lake Rd, <br />Lexington north of 96, Cummings and Floral Parks. <br /> The CIP for Parks is available online. The budget has been adjusted and will be available <br />when it is approved. <br /> Added trail extension tied to Ramsey County’s Roundabout at Snelling/County Rd E. <br />The extension is due to pedestrian use in this location at the end of Snelling Ave N. Users <br />tend to cut through residential maintained ROW, so the City is adding this feature to <br />correct that movement. <br /> Ramsey County All-Abilities 2050 Transportation Plan – Online Survey. Please have all <br />PTRC members participate in this survey and get your voice heard. <br />Attachments <br />Attachment A – Trail Extension for Snelling Ave N <br />Attachment B – Ramsey County MultiModel Plan Survey