My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
04-10-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2023 4:24:07 PM
Creation date
4/6/2023 4:26:51 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subject Property in the east and west configuration would be consistent and compatible <br />with the neighborhood. <br />15. The variance request is not based on economic considerations alone. <br />Options and Motion Language <br />The Planning Commission reviewed this application at their March 8, 2023 meeting. At that time, <br />they recommended approval with conditions of the application from Mr. Mezzenga for a Minor <br />Subdivision and Variance by a 4-1 vote. The following are motion language options for the City <br />Council to consider. <br />• Approve with Conditions: Motion to approve Planning Case 23-003 and Resolution 2023-017 <br />for a Minor Subdivision and Variance as submitted by the Applicant in Site Plan B at 1174 <br />Edgewater Avenue, based on the findings of fact and the submitted plans, as amended by the <br />conditions below: <br />1. The Applicant shall record the Minor Subdivision with Ramsey County and a copy <br />shall be provided to the City within sixty (60) days of the City's approval. <br />2. The Applicant shall record the drainage and utility easements as required under the <br />Subdivision ordinance on the recorded survey with Ramsey County and a copy shall <br />be provided to the City within sixty (60) days of the City's approval. <br />3. The Applicant shall pay the required park development fee of $6,500 for Tract B <br />prior to issuance of permits for either lot within the Minor Subdivision. <br />4. Monument stakes shall be installed to demarcate the property lines between Tract A <br />and Tract B. <br />5. A Building Permit shall be required on each lot for construction of the new dwelling. <br />6. The proposed buildings shall conform to all other standards and regulations in the <br />City Code. <br />7. A Grading and Erosion permit for each lot shall be obtained from the City's <br />PW/Engineering Division prior to commencing any grading, land disturbance or <br />utility activities. <br />8. Upon completion of grading and utility work on the site, a grading as -built and utility <br />as -built shall be provided to the City. <br />9. Final grading, drainage, and utility plans shall be subject to approval by the Public <br />Works Director/City Engineer prior to the issuance of a grading and erosion control <br />permit or other development permits. <br />10. Heavy duty silt fence and adequate erosion control around the entire construction site <br />shall be required and maintained by the Applicant during construction to ensure that <br />sediment and storm water does not leave the project site. <br />11. The Applicant shall be responsible for providing verification of approval and <br />obtaining any permit necessary from the Rice Creek Watershed District prior to the <br />start of any site activities. <br />12. A separate right-of-way permit for each lot shall be required for work performed <br />within the City right-of-way. <br />13. The Applicant shall be responsible for obtaining a Sanitary Sewer Connect Permit. <br />14. The Applicant shall be responsible for obtaining a Water Connect Permit. <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.