My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Johanna Boulevard <br />Trail Design Study <br />Preliminary Design Development Report 16 September 27, 2022 <br />Trail Connections <br />A key element of any successful trail system is how it improves connectivity to points of interest within a <br />community and the broader region. The proposed Lake Johanna Boulevard trail improvements will provide critical <br />connections between Arden Hills neighborhoods and Tony Schmidt Regional Park, Lake Johanna and Lake Johanna <br />Shores community. The eastern terminus of the trail will complete connections to existing trails which extend <br />northerly to Bethel College and Mounds View High School, easterly along the County Road E commercial district <br />and most recently to the south along Old Snelling Avenue towards Roseville. The proposed trail will connect to the <br />northern leg of the Elmer Anderson Trail within Tony Schmidt Regional Park. The trail could also connect to the <br />southern leg of the Elmer Anderson Trail in conjunction with a short segment of trail that could be constructed <br />along County Road E west of Lake Johanna. <br />The City of Roseville has expressed interest in extending a trail facility along Fairview Avenue south of County Road <br />D to connect to their existing trail network at Lydia Avenue. <br />In addition to connecting to existing and proposed trail facilities, the project should include improvements to <br />existing intersections to facilitate safe and visible connections between adjacent neighborhoods and the trail <br />facility. <br />Figure 9. Corridor Opportunities, Constraints and Connectivity <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.