Laserfiche WebLink
Lake Johanna Boulevard <br />Trail Design Study <br />Preliminary Design Development Report 51 September 27, 2022 <br />2360.509 TYPE SP 12.5 BIT <br />PATCHING MIX <br />(4;L) <br />SY $60.00 1600 $96,000 0% $ - $96,000 <br /> <br />2411.603 RETAINING WALL SQ FT $50.00 3500 $175,000 0% $ - $175,000 <br /> <br />2503.503 STORM SEWER <br />PIPE <br />LIN FT $90.00 8000 $720,000 0% $ - $720,000 <br />2506.502 STORM SEWER <br />STRUCTURE <br />EACH $4,500.00 40 $180,000 0% $ - $180,000 <br />2506.601 WATER QUALITY <br />ALLOWANCE <br />LUMP <br />SUM <br />$250,000.00 1 $250,000 0% $ - $250,000 <br /> <br />2521.518 4" CONCRETE <br />WALK <br />SQ FT $8.00 3500 $28,000 50% $14,000 $14,000 <br />2521.518 6" CONCRETE <br />WALK <br />SQ FT $12.00 4800 $57,600 50% $28,800 $28,800 <br />2521.518 3" BITUMINOUS <br />WALK <br />SQ FT $4.00 78000 $312,000 50% $156,000 $156,000 <br /> <br />2531.503 CONCRETE CURB <br />& GUTTER DESIGN <br />B624 <br />LIN FT $35.00 8200 $287,000 75% $215,250 $71,750 <br />2531.504 6" CONCRETE <br />DRIVEWAY <br />PAVEMENT <br />SQ YD $90.00 2400 $216,000 0% $ - $216,000 <br />2531.504 TRAIL LIGHTING <br />ALLOWANCE <br />LUMP <br />SUM <br />$100,000.00 1 $100,000 100% $100,000 $ - <br />2531.618 TRUNCATED <br />DOMES <br />SQ FT $65.00 750 $48,750 50% $24,375 $24,375 <br /> <br />2563.601 TRAFFIC CONTROL <br />ALLOWANCE <br />LUMP <br />SUM <br />$60,000.00 1 $60,000 0% $ - $60,000 <br /> <br />2571.524 LANDSCAPING <br />ALLOWANCE <br />LUMP <br />SUM <br />$100,000.00 1 $ 100,000 100% $100,000 $ - <br />2573.601 EROSION <br />CONTROL <br />ALLOWANCE <br />LUMP <br />SUM <br />$50,000.00 1 $50,000 0% $ - $50,000 <br />2574.507 BOULEVARD <br />TOPSOIL BORROW <br />CU YD $35.00 1800 $63,000 0% $ - $63,000 <br />2575.504 SODDING TYPE <br />SALT TOLERANT <br />SQ YD $10.00 14000 $140,000 0% $ - $140,000 <br /> <br />2582.501 SIGNING AND <br />STRIPING <br />ALLOWANCE <br />LUMP <br />SUM <br />$100,000.00 1 $100,000 0% $ - $100,000 <br /> <br /> CONTINGENCY <br />(30%) <br />LUMP <br />SUM <br /> $1,300,000 1 $1,300,000 30% $200,000 $1,100,000 <br /> <br /> SUBTOTAL <br />ROADWAY AND <br /> $ <br />5,550,000 <br /> $ <br />840,000 <br /> $ <br />4,710,000