My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Softball in-field grading and maintenance work to be completed spring timeframe by FTE’s. Field <br />lighting, fencing, dugouts, bases/ base boxes, trash/ recycling receptacles, and field signage will be <br />inspected and repaired as needed. Ongoing maintenance, field preparation prior to practices/ games is <br />completed by SPT Staff. The park location and number of fields is listed below. <br />x Cummings Park (1 field) <br />x Royal Park (1 field) <br />x Floral Park (1 field) <br />x Perry Park (3 fields) <br />x Hazelnut Park (1 field) <br />Athletic field striping and setup is completed for soccer and soft ball fields and is completed at the <br />following parks throughout the spring, summer, and fall. This includes the initial field layout and soccer <br />goal setup completed by FTE’s. <br />x Royal Park (foul lines) <br />x Cummings Park (foul lines, 2 adult soccer fields, 1 youth soccer field) <br />x Floral Park (foul lines) <br />x Perry Parks foul lines, 3 fields) <br />x Hazelnut Park (foul lines, 2 adult soccer fields) <br />x Valentine Hills Elementary running track <br />Perry Dog Park improvements (map below).
The URL can be used to link to this page
Your browser does not support the video tag.