Laserfiche WebLink
Tree and Misc. Watering is completed with tree bags during the first 2-3 years after planting. New trees <br />that were planted in 2022 will receive tree bags and fertilized on a routine basis throughout the growing <br />season. The majority of new trees were planted along Highway 96. In an effort to establish grass within <br />PW project areas, the tanker will be used for that purpose. <br />Tree Mulching will be completed around all trees located along Highway 96 ROW between Highway 10 <br />and Lexington Ave. Newly planted trees from November 2022 have mulch installed by the contractor. <br />FTE’s will mulch the remaining trees. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />