My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sanitary Sewer Manhole Inspections are completed within the third of the city that is being cleaned <br />each year. Below are a few items that Staff are looking for during a manhole inspection. Through <br />inspection activities, a report is prepared annually to evaluate maintenance activities and goals for <br />future projects. <br />x Adjusting rings, mortar, or any other concrete repairs needs. <br />x Evidence of inflow and infiltration (I and I) <br />x Tree root intrusion and the overall condition of the structure. <br />Annual Sanitary Sewer Cleaning- <br />x The below map indicates the sanitary sewer segments (shown in green) that PW cleans on an <br />annual basis due to excessive buildup, low flow, or flat grade that causes the line to require <br />additional service each year.
The URL can be used to link to this page
Your browser does not support the video tag.