My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lift Station Standby Generator Maintenance and testing. The standby generators are an important part <br />of the utility department in the event of a power outage. The generator located at the booster station/ <br />south water tower will run the pumps to fill the north water tower. The north water tower supplies <br />water to the north half of the city. The three remaining generators are used for sanitary sewer lift <br />stations, and city hall during a power loss. <br />x LS 8 and LS 11 both have standby generators stored onsite. There is also a mobile generator <br />stored at the PW Facility used for lift station emergencies. <br />x A monthly inspection and test run are completed by AHPW Staff. <br />x An annual multi point inception for the diesel engine and generator is completed with a 2-hour <br />load bank test buy an outside vendor. <br />Sanitary Sewer Root Treatment is a proactive approach to removing tree roots from the sewer system, <br />generally found in VCP pipe. The below map indicates the proposed areas where root treatment is <br />needed this year, based on historical treatments or new segments added found during last years <br />televising.
The URL can be used to link to this page
Your browser does not support the video tag.