Laserfiche WebLink
Open Ditches & infiltration basins follow the same maintenance activities. Inspection for repairs or <br />erosion issues, remove debris and vegetation removal. <br /> <br />Catch Basins – Public Works conducts full structure inspections every 5 years to address any repair <br />needs. Issues to look for are inflow & infiltration, settling of surrounding pavement or curb, cracking of <br />interior structure concrete, drain tile cleaning and any blockage with flow. <br />Storm sewer mainlines – Inspection via televising camera is conducted on an as-needed basis. Full <br />inspections are completed prior to Pavement Management Program (PMP) projects to identify any <br />structural repairs needed. <br /> <br />Grading and Erosion Control Permit management – Following City Ordinance Chapter 15 (Erosion and <br />Sediment Control) along with MS4 requirements, construction site inspections are conducted for all land <br />disturbance activities for both residential projects and developments as defined within the ordinance. <br />These inspections ensure that the permit holder is staying in compliance with what is required for <br />erosion control and helps promote water quality. <br /> <br />Gopher State One Callout locates for structures, sewer main along both City and County roads.