My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
03-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:39:38 AM
Creation date
4/7/2023 8:35:09 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HR Green, Inc. <br />Project B2204225 <br />October 3, 2022 <br />Page 14 <br /> <br /> <br />flooding, irrigation, seasonal freezing and thawing, surface drainage modifications and other seasonal <br />and annual factors. <br /> <br />E.2. Continuity of Professional Responsibility <br /> <br />E.2.a. Plan Review <br />We based this report on a limited amount of information, and we made a number of assumptions to help <br />us develop our recommendations. We should be retained to review the geotechnical aspects of the <br />designs and specifications. This review will allow us to evaluate whether we anticipated the design <br />correctly, if any design changes affect the validity of our recommendations, and if the design and <br />specifications correctly interpret and implement our recommendations. <br /> <br />E.2.b. Construction Observations and Testing <br />We recommend retaining us to perform the required observations and testing during construction as <br />part of the ongoing geotechnical evaluation. This will allow us to correlate the subsurface conditions <br />exposed during construction with those encountered by the borings and provide professional continuity <br />from the design phase to the construction phase. If we do not perform observations and testing during <br />construction, it becomes the responsibility of others to validate the assumption made during the <br />preparation of this report and to accept the construction-related geotechnical engineer-of-record <br />responsibilities. <br /> <br />E.3. Use of Report <br /> <br />This report is for the exclusive use of the addressed parties. Without written approval, we assume no <br />responsibility to other parties regarding this report. Our evaluation, analyses and recommendations may <br />not be appropriate for other parties or projects. <br /> <br />E.4. Standard of Care <br /> <br />In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under <br />similar circumstances by reputable members of its profession currently practicing in the same locality. <br />No warranty, express or implied, is made. <br />47
The URL can be used to link to this page
Your browser does not support the video tag.