Laserfiche WebLink
WHEREAS the Planning Commission considered the Applicant's request for a Minor <br />Subdivision and Variance and, as such voted 4-1 in favor of recommending approval with <br />conditions. <br />NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE <br />CITY OF ARDEN HILLS: <br />Herby adopts Resolution 2023-017 approving Planning Case 2023-003 for a Minor <br />Subdivision and Variance of the Subject Property at 1174 Edgewater Avenue to subdivide the <br />parcel into two parcels for future development with single-family residential dwellings. <br />BE IT FURTHER RESOLVED that City Council approves Planning Case 23-003 for a <br />Minor Subdivision and Variance on the Subject Property at 1174 Edgewater Avenue, based on the <br />findings of fact and the submitted plans in the April 10, 2023 Report to the City Council, as <br />amended by the following conditions: <br />1) The Applicant shall record the Minor Subdivision with Ramsey County and a copy <br />shall be provided to the City within sixty (60) days of the City's approval. <br />2) The Applicant shall record the drainage and utility easements as required under the <br />Subdivision ordinance on the recorded survey with Ramsey County and a copy shall <br />be provided to the City within sixty (60) days of the City's approval. <br />3) The Applicant shall pay the required park development fee of $6,500 for Tract B prior <br />to issuance of permits for either lot within the Minor Subdivision. <br />4) Monument stakes shall be installed to demarcate the property lines between Tract A <br />and Tract B. <br />5) A Building Permit shall be required on each lot for construction of the new dwelling. <br />6) The proposed buildings shall conform to all other standards and regulations in the City <br />Code. <br />7) A Grading and Erosion permit for each lot shall be obtained from the City's <br />PW/Engineering Division prior to commencing any grading, land disturbance or utility <br />activities. <br />8) Upon completion of grading and utility work on the site, a grading as -built and utility <br />as -built shall be provided to the City. <br />9) Final grading, drainage, and utility plans shall be subject to approval by the Public <br />Works Director/City Engineer prior to the issuance of a grading and erosion control <br />permit or other development permits. <br />10) Heavy duty silt fence and adequate erosion control around the entire construction site <br />shall be required and maintained by the Applicant during construction to ensure that <br />sediment and storm water does not leave the project site. <br />Page 2 of 3 <br />To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting <br />cityofardenhills. org and clicking on Archived Documents under Helpful Links on our main webpage. <br />