My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-02-23 PTRC Special
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2023
>
05-02-23 PTRC Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 2:43:21 PM
Creation date
4/28/2023 2:42:42 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 3 - Perry Park:Perry Park notes: The natural areas of the park are sandwiched by County land. It would <br />be prudent to work with Ramsey County to coordinate any restoration efforts across property lines for long term <br />success. The site appears to want to be Oak Savanna with woodland pockets on the east and north facing slopes <br />and wetland edges.(rough estimates: $120,000 for Perry Park) <br />Woodland/Forested Areas:~16.8 acres <br />●Removal of invasive tree and shrub species and management of other broadleaf invasive species <br />●Tree thinning and possible ash removal. There are a lot of trees of similar age class and not a lot of signs of <br />oak regeneration due to dense canopy. <br />●60-70% reduction in dead and down material. <br />●All wood material being removed would either be chipped and hauled off or ideally be processed as Biochar <br />on site and spread back out. <br />○Material along steep slopes will be a challenge and will need to address how to remove – possibility <br />of portable biochar kilns (desirable) or burn piles (less desirable). <br />●Initial planting of the ground layer with a simple savanna/woodland grass mix – This will help create a fuel <br />load in prep for any future prescribed burn regime. <br />●After tree thinning, selective tree and shrub planting of desirable species. Set up 2 year watering regime for <br />all planted trees and shrubs. <br />●In the last year of the grant plant and seed flowering plants. Planted material would be in 10x10 nursery <br />plots that could be divided down the road and transplanted across the sites.
The URL can be used to link to this page
Your browser does not support the video tag.