Laserfiche WebLink
UNFINISHED BUSINESS – 3E <br />MEMORANDUM <br />DATE:March 21, 2023 <br />TO:Parks, Trails and Recreation Committee <br />FROM:Lucas Miller, Assistant Public Works Director <br />SUBJECT: Trail and Parks Projects Update <br />Previously Discussed Items: <br />Lexington Ave will not be completed until summer 2023. <br />Safe Routes to School from MVHS to E2 down Lake Valentine Road/Old Highway 10 is <br />scheduled for construction this summer 2023. SRF is preparing documents for bidding <br />currently. Open house took place this fall. There were $450k in grants for this project. <br />City is working with a consultant to pursue grants for the trail from Lake Valentine Road <br />to Highway 96 along Old Highway 10. Feasibility study has been completed for this <br />project this last fall. Estimated project cost is $2.6 Mil. <br />Lake Johanna Blvd trail study was completed by Ramsey County and they are pursuing <br />funding currently. They are shooting for a final design in 2028. <br />Open House for Floral and Arden Manor parks took place in early February. There was a <br />great showing from the residents. Public surveys have been collected and presented to <br />Council for consideration for both. Results of the surveys were provided for PTRC to <br />look at in January. Design for both projects are ongoing and construction is slotted for <br />2023. Arden Manor funding are grants combined with city funding. Floral is city funding. <br />Annual trail maintenance is being scheduled for summer 2023 along Round Lake Rd, <br />Lexington north of 96, Cummings and Floral Parks. <br />The CIP for Parks is available online. The budget has been adjusted and will be available <br />when it is approved. <br />New/Updated Items: <br />Floral and Arden Manor Park Conceptual Layouts, as requested. <br />2023 Tree Plan Project Suggested Locations: <br />o Hazelnut at old tree locations x2 (near old stumps) <br />o Highway 96 <br />Attachments <br />Attachment A – Floral and Arden Manor Exhibits