My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-23 PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2023
>
03-21-23 PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 2:46:24 PM
Creation date
4/28/2023 2:46:13 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
View images
View plain text
UNFINISHED BUSINESS – 3E <br />MEMORANDUM <br />DATE:March 21, 2023 <br />TO:Parks, Trails and Recreation Committee <br />FROM:Lucas Miller, Assistant Public Works Director <br />SUBJECT: Trail and Parks Projects Update <br />Previously Discussed Items: <br />Lexington Ave will not be completed until summer 2023. <br />Safe Routes to School from MVHS to E2 down Lake Valentine Road/Old Highway 10 is <br />scheduled for construction this summer 2023. SRF is preparing documents for bidding <br />currently. Open house took place this fall. There were $450k in grants for this project. <br />City is working with a consultant to pursue grants for the trail from Lake Valentine Road <br />to Highway 96 along Old Highway 10. Feasibility study has been completed for this <br />project this last fall. Estimated project cost is $2.6 Mil. <br />Lake Johanna Blvd trail study was completed by Ramsey County and they are pursuing <br />funding currently. They are shooting for a final design in 2028. <br />Open House for Floral and Arden Manor parks took place in early February. There was a <br />great showing from the residents. Public surveys have been collected and presented to <br />Council for consideration for both. Results of the surveys were provided for PTRC to <br />look at in January. Design for both projects are ongoing and construction is slotted for <br />2023. Arden Manor funding are grants combined with city funding. Floral is city funding. <br />Annual trail maintenance is being scheduled for summer 2023 along Round Lake Rd, <br />Lexington north of 96, Cummings and Floral Parks. <br />The CIP for Parks is available online. The budget has been adjusted and will be available <br />when it is approved. <br />New/Updated Items: <br />Floral and Arden Manor Park Conceptual Layouts, as requested. <br />2023 Tree Plan Project Suggested Locations: <br />o Hazelnut at old tree locations x2 (near old stumps) <br />o Highway 96 <br />Attachments <br />Attachment A – Floral and Arden Manor Exhibits
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).