Laserfiche WebLink
March 9, 2023 Northern Dewatering, Inc. 5 <br />number of the pump available, which is welded to the frame of the unit. Credit is not <br />given for periods when the Equipment is not used. If damage of any kind is caused <br />by Customer from improper use, application, lack of maintenance, etc., the Customer <br />agrees to pay for the repairs needed. If the Customer is given written authorization to <br />complete repairs caused by normal wear and tear and then submits reasonable <br />receipts for the costs incurred, NDI will issue a credit memo to the Customer's <br />account. Labor will be reimbursed at the rate of $45.00 per approved hour. <br />12. There are no warranties, express or implied, which extend beyond those shown in <br />this Agreement. <br />13. Performance of a site survey, which physically indicates, by survey stakes the <br />location of all well/work sites in accordance with this agreement. <br />14. Preparation of suitable areas, including clearing and grubbing, for equipment and <br />material storage, field buildings, office trailers and tool sheds. <br />15. Acquisition and maintenance of all permits and licenses required under Minnesota <br />Rules part 4725.3200, sub 3, for the completion of NDI's work. <br />16.Installation and maintenance of area lighting. Jobsite security. Access to adequate <br />sanitation facilities. Access to adequate communication facilities. Access to <br />adequate emergency services and all emergency services provided to or by the prime <br />contractor. Adequate pedestrian and traffic control and protection. <br />17. All operation and day to day maintenance (including daily start-up and testing) of all <br />the pumping equipment installed, including manpower, checking, providing and <br />maintaining fuel and other fluid levels, electricity, greasing pump fittings, providing <br />fuel tanks, etc. <br />18. Removal and loading of NDI's equipment upon completion of its usage if removal <br />charge is not accepted. <br />19. Construction and maintenance of berms, dikes, ditches, equipment pads, <br />excavations, all excavation, all excavation shoring, ramps, sumps, trenches, well sites <br />and all other reasonable and necessary site preparation. Construction and <br />maintenance of access roads capable of accommodating two -wheel drive <br />construction and support vehicles under their own power to all work sites. <br />Construction, assembly and maintenance of all necessary catwalks, ladders, and <br />scaffolding, bracing, cribbing and other equipment supports. <br />20. Adequate protection of NDI's equipment from damage due to actions or omissions. <br />21. Removal of unusual, unnatural or unanticipated underground and surface <br />obstructions, including concrete, that were not anticipated during the planning of the <br />Scope of Work. Marking and any necessary relocation or protection of all on -site and <br />surrounding utilities and service lines above and beneath the ground. <br />22. Adequate control of water accumulating as perched or trapped water, overtopping <br />water, runoff, seepage, surface water, interface water and in any other form not <br />contemplated by NDI's pumping plan. Adequate control of erosion and sedimentation <br />caused by discharge water or other runoff. <br />23. Monitoring, sampling, testing, containment, treatment and disposal of discharge <br />water, if necessary and unless otherwise provided by NDI's pumping proposal. <br />24. Stand-by power if required. <br />25. Containment, treatment and disposal of all drilling cuttings, excavation spoils, and <br />spent drilling and jetting fluids. <br />14405 NorOdale Blvd-• Ri)gers, MN 55374 i . ,wo;raso,w <br />(70 420-2616* FAN (76N 42$-2071 •www_northerndewatering.com q <br />