Laserfiche WebLink
ARDEN HILLS CITY COUNCIL — APRIL 10, 2023 <br />15 <br />2. The Applicant shall record the drainage and utility easements as required under the <br />Subdivision ordinance on the recorded survey with Ramsey County and a copy shall be <br />provided to the City within sixty (60) days of the City's approval. <br />3. The Applicant shall pay the required park development fee of $6,500 for Tract B prior to <br />issuance of permits for either lot within the Minor Subdivision. <br />4. Monument stakes shall be installed to demarcate the property lines between Tract A and <br />Tract B. <br />5. A Building Permit shall be required on each lot for construction of the new dwelling. <br />6. The proposed buildings shall conform to all other standards and regulations in the City <br />Code. <br />7. A Grading and Erosion permit for each lot shall be obtained from the City's <br />PW/Engineering Division prior to commencing any grading, land disturbance or utility <br />activities. <br />8. Upon completion of grading and utility work on the site, a grading as -built and utility as - <br />built shall be provided to the City. <br />9. Final grading, drainage, and utility plans shall be subject to approval by the Public Works <br />Director/City Engineer prior to the issuance of a grading and erosion control permit or <br />other development permits. <br />10. Heavy duty silt fence and adequate erosion control around the entire construction site shall <br />be required and maintained by the Applicant during construction to ensure that sediment <br />and storm water does not leave the project site. <br />11. The Applicant shall be responsible for providing verification of approval and obtaining <br />any permit necessary from the Rice Creek Watershed District prior to the start of any site <br />activities. <br />12. A separate right-of-way permit for each lot shall be required for work performed within <br />the City right-of-way. <br />13. The Applicant shall be responsible for obtaining a Sanitary Sewer Connect Permit. <br />14. The Applicant shall be responsible for obtaining a Water Connect Permit. <br />15. Prior to the issuance of a building permit, the Applicant shall be financially responsible for <br />100 percent of all applicable sewer connection, sewer availability, water connection, water <br />availability and Metropolitan Council SAC charges. <br />16. A Tree Preservation Plan shall be required as part of the Building Permit application for <br />the new dwelling on Tract A and Tract B. Any tree removal, preservation, and mitigation <br />shall be completed in accordance with City Code Section 1325.055. <br />17. Future development on Tract A would be evaluated as presented in Site Plan B designating <br />the north and east elevations as the required front yards. <br />18. Future development on Tract B would be evaluated as presented in Site Plan B designating <br />the north and east elevation as the required front yards. <br />19. The Minor Subdivision shall be required to comply with all applicable provisions of <br />Section 1330, Shoreland Regulations and the Applicant is to submit an updated certificate <br />of survey in satisfaction of these requirements prior to issuance of any building permits for <br />the new home construction on Tract A or B. <br />20. Tract A as shown on Site Plan B as measured from the south property line shall adhere to a <br />side yard setback of no less than 10 feet. <br />Councilmember Holden asked if this request meets and/or exceeds the shoreline ordinance. <br />