Laserfiche WebLink
OPINION OF PROBABLE PROJECT COST <br />Arden Hills <br />Park Improvements <br />May 15, 2023 <br />Prepared by HR Green <br />Attachment C <br />ITEM <br />NUMBER <br />ITEM DESCRIPTION <br />UNITS <br />UNIT COST <br />C.P. 20-PARK-003 <br />ESTIMATED <br />TOTAL COST <br />ARDEN MANOR PARK <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$ 7,700.00 <br />1 <br />$ 7,700.00 <br />2101.505 <br />CLEARING <br />ACRE <br />$ 9,900.00 <br />0.05 <br />$ 495.00 <br />2104.502 <br />REMOVE WOOD POST <br />EACH <br />$ 110.00 <br />6 <br />$ 660.00 <br />2104.503 <br />REMOVE CHAIN LINK FENCE <br />LIN FT <br />$ 12.00 <br />297 <br />$ 3,564.00 <br />2104.504 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$ 4.00 <br />864 <br />$ 3,456.00 <br />2104.504 <br />REMOVE CONCRETE SLAB <br />SQ YD <br />$ 24.00 <br />72 <br />$ 1,728.00 <br />2104.504 <br />REMOVE CONCRETE WALK <br />SQ YD <br />1 $ 39.00 <br />21 <br />$ 819.00 <br />2104.601 <br />REMOVE PLAYGROUND EQUIPMENT <br />LUMP SUM <br />$ 5,500.00 <br />1 <br />$ 5,500.00 <br />2104.602 <br />REMOVE BASKETBALL GOAL AND POST <br />EACH <br />$ 1,400.00 <br />2 <br />$ 2,800.00 <br />2104.602 <br />REMOVE SHELTER <br />EACH <br />$ 3,300.00 <br />1 <br />$ 3,300.00 <br />2104.603 <br />REMOVE LANDSCAPE TIMBER CURB <br />LIN FT <br />$ 18.00 <br />290 <br />$ 5,220.00 <br />2104.604 <br />REMOVE PLAYGROUND SURFACING <br />SQ YD <br />$ 5.50 <br />510 <br />$ 2,805.00 <br />2106.507 <br />COMMON EMBANKMENT CV <br />CU YD <br />$ 8.80 <br />321 <br />$ 2,824.80 <br />2106.507 <br />EXCAVATION - COMMON <br />CU YD <br />$ 8.80 <br />739 <br />$ 6,503.20 <br />2106.507 <br />SELECT GRANULAR EMBANKMENT CV <br />CU YD <br />$ 18.00 <br />598 <br />$ 10,755.87 <br />2108.504 <br />GEOTEXTILE FABRIC TYPE 5 <br />SQ YD <br />$ 1.10 <br />595 <br />$ 654.50 <br />2211.507 <br />AGGREGATE BASE CV CLASS 5 <br />CU YD <br />$ 25.00 <br />186 <br />$ 4,650.79 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIX (2,C) <br />TON <br />$ 94.00 <br />147 <br />$ 13,854.35 <br />2401.507 <br />STRUCTURAL CONCRETE 3G52 <br />CU YD <br />$ 390.00 <br />17 <br />$ 6,630.00 <br />2401.508 <br />REINFORCEMENT BARS (EPDXY COATED) <br />LB <br />$ 2.00 <br />3350 <br />$ 6,700.00 <br />2502.503 <br />4" PE PIPE DRAIN <br />LIN FT <br />$ 21.00 <br />112 <br />$ 2,341.50 <br />2502.503 <br />4" PERF PE PIPE DRAIN <br />LIN FT <br />$ 16.00 <br />984 <br />$ 15,744.00 <br />2502.602 <br />4" PVC PIPE DRAIN CLEANOUT <br />EACH <br />$ 550.00 <br />16 <br />$ 8,800.00 <br />2521.518 <br />4" CONCRETE WALK <br />SQ FT <br />$ 33.00 <br />50 <br />$ 1,650.00 <br />2521.603 <br />5" THICK x 18" WIDE CONCRETE MAINTENANCE STRIP <br />LIN FT <br />$ 59.00 <br />294 <br />$ 17,346.00 <br />2531.503 <br />CONCRETE CURB DESIGN V4 <br />LIN FT <br />$ 40.00 <br />283 <br />$ 11,320.00 <br />2540.601 <br />PORTABLE TOILET SCREENING <br />LUMP SUM <br />$ 8,300.00 <br />1 <br />$ 8,300.00 <br />2540.602 <br />INSTALL BASKETBALL GOAL AND POST <br />EACH <br />$ 3,300.00 <br />2 <br />$ 6,600.00 <br />2540.602 <br />INSTALL BENCH <br />EACH <br />$ 880.00 <br />2 <br />$ 1,760.00 <br />2540.602 <br />INSTALL BICYCLE RACK <br />EACH <br />$ 280.00 <br />1 <br />$ 280.00 <br />2540.602 <br />INSTALL GAGA BALL PIT <br />EACH <br />$ 550.00 <br />1 <br />$ 550.00 <br />2540.602 <br />INSTALL GRILL <br />EACH <br />$ 1,100.00 <br />1 <br />$ 1,100.00 <br />2540.602 <br />INSTALL HOT COAL BIN <br />EACH <br />$ 550.00 <br />1 <br />$ 550.00 <br />2540.602 <br />INSTALL PET WASTE BAG STATION <br />EACH <br />$ 550.00 <br />1 <br />$ 550.00 <br />2557.602 <br />10' HIGH, 10' WIDE DOUBLE GATE <br />EACH <br />$ 1,100.00 <br />1 <br />$ 1,100.00 <br />2557.603 <br />10' HIGH, 3-RAIL CHAIN -LINK PERIMETER FENCE <br />LIN FT <br />$ 66.00 <br />272 <br />$ 17,952.00 <br />2557.603 <br />4' HIGH, 3-RAIL CHAIN -LINK PERIMETER FENCE <br />LIN FT <br />$ 110.00 <br />10 <br />$ 1,100.00 <br />2572.503 <br />TEMPORARY FENCE <br />LIN FT <br />$ 6.60 <br />314 <br />$ 2,072.40 <br />2573.502 <br />CULVERT END CONTROLS <br />EACH <br />$ 150.00 <br />2 <br />$ 300.00 <br />2573.503 <br />SILT FENCE, TYPE MS <br />LIN FT <br />$ 2.40 <br />833 <br />$ 1,999.20 <br />2574.508 <br />FERTILIZER TYPE 3 <br />POUND <br />$ 2.80 <br />50 <br />$ 140.00 <br />2575.508 <br />HYDRAULIC MULCH MATRIX <br />POUND <br />$ 0.80 <br />588 <br />$ 470.40 <br />2575.508 <br />SEED MIXTURE 25-131 <br />POUND <br />$ 4.30 <br />62 <br />$ 264.88 <br />2575.607 <br />WOOD FIBER MULCH <br />CU YD <br />$ 33.00 <br />183 <br />$ 6,039.00 <br />2582.604 <br />ACRYLIC COLOR SURFACING <br />SQ YD <br />$ 11.00 <br />515 <br />$ 5,668.67 <br />BY OTHERS <br />FURNISH AND INSTALL PICNIC TABLE <br />EACH <br />$ 1,500.00 <br />2 <br />$ 3,000.00 <br />ERS <br />FURNISH AND INSTALL PLAYGROUND EQUIPMENT <br />LUMP SUM <br />$ 115,469.11 <br />$ <br />BY OTHERS <br />FURNISH AND INSTALL PORTABLE TOILET <br />EACH <br />$ 500.00 <br />$ 500. <br />THERS <br />BY OTHERS <br />FURNISHR <br />INSTALL GARBAGE CAN <br />EACH <br />EACH <br />$ 41,006.00 <br />$ 50.00 <br />2 <br />$ <br />$ 100.00 <br />BY OTHERS <br />INSTALL SIGN <br />EACH <br />$ 50.00 <br />2 <br />$ 100.00 <br />BY OTHERS <br />PURCHASE BASKETBALL GOAL AND POST <br />EACH <br />$ 3,000.00 <br />2 <br />$ 6,000.00 <br />BY OTHERS <br />PURCHASE BENCH <br />EACH <br />$ 1,500.00 <br />2 <br />$ 3,000.00 <br />BY OTHERS <br />PURCHASE BICYCLE RACK <br />EACH <br />$ 250.00 <br />1 <br />$ 250.00 <br />BY OTHERS <br />PURCHASE GAGA BALL PIT <br />EACH <br />$ 2,000.00 <br />1 <br />$ 2,000.00 <br />BY OTHERS <br />PURCHASE GRILL <br />EACH <br />$ 1,000.00 <br />1 <br />$ 1,000.00 <br />BY OTHERS <br />PURCHASE HOT COAL BIN <br />EACH <br />$ 500.00 <br />1 <br />$ 500.00 <br />BY OTHERS <br />PURCHASE PET WASTE BAG STATION <br />EACH <br />$ 200.00 <br />1 <br />$ 200.00 <br />BY OTHERS <br />REMOVE PICNIC TABLE <br />EACH <br />$ 50.00 <br />2 <br />$ 100.00 <br />BY OTHERS <br />SALVAGE GARBAGE CAN <br />I EACH <br />1 $ 50.00 <br />2 <br />$ 100.00 <br />BY OTHERS <br />SALVAGE SIGN <br />EACH <br />$ 50.00 <br />2 <br />$ 100.00 <br />TOTAL ARDEN MANOR PARK COST $ 378,043.66 <br />ARDEN MANOR PARKContractor cost <br />City cost <br />OnSite Companies cost <br />Playground vendor cost <br />TOTAL <br />204, 618.55 <br />16,450.00 <br />500.00 <br />156,475.11 <br />378,043.66 <br />Page 1 of 1 H R G ree n <br />