My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
05-22-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2023 4:02:39 PM
Creation date
5/18/2023 3:53:06 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Provide a full project description <br />Mounds View High School is in Arden Hills, with a student population of <br />including the locations and uses of <br />1,927. Previous City and District sidewalk and trail improvements have <br />each improvement identified above. <br />constructed separated walkway and ADA improvements along Lake <br />Include any project maps or design <br />Valentine Road adjacent to the high school parking lot and a connection <br />exhibits. These exhibits may be <br />from Crystal Avenue to Valentine Park. In addition, recent City and County <br />uploaded with your application. <br />improvements include a separated trail along Snelling Avenue North from <br />Lake Johanna Boulevard, north to W. County Road E2, connecting to an <br />existing trail section. The proposed trail, walking and ADA improvements <br />will fill in existing walkway gaps and completely connect the walking system <br />directly to Mounds View High School. This trail completes direct <br />connections from Lake Johanna Boulevard, Bethel University, Valentine <br />Hills Elementary School, Valentine Park directly to Mounds View High <br />School, connecting to future trail improvements north also. The proposed <br />improvements include full separation of the trail sections from the roadway <br />with concrete curb and gutter, filling in missing trail and walkway segments <br />and utilizing existing curb and gutter for separation. ADA improvements <br />will be provided at each intersection and ADA compliance at all driveway <br />crossings. Trail sections include a minimum, a 2-foot clear zone and an <br />8-foot trail, where the trail is immediately adjacent to the road, about 1/3 of <br />the project length. The remaining sections will provide a minimum 6-foot <br />boulevard buffer between the back of curb and an 8-foot trail section. The <br />proposed trail sections are along the west side of Snelling Avenue and the <br />south side of Lake Valentine Road. The Mounds View High School and <br />Valentine Park are on these same sides of the road, eliminating crossings <br />at major intersections for students using the new trail. <br />J. Safety Concerns <br />Does the school(s) or school district No <br />have a no walking and/or bicycling to <br />school policy? <br />Does the school(s) provide hazard No <br />busing? <br />Does the school(s) district have plans No <br />relocate or repurpose the school <br />facilities within the next 10 years? <br />Does the school(s) or school district Yes <br />promote any activities or policies to <br />encourage students walking and <br />bicycling? <br />
The URL can be used to link to this page
Your browser does not support the video tag.