Laserfiche WebLink
6/6/2023 Page 7 of 11 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:CITY OF ARDEN HILLS <br />Project:OLD HIGHWAY 10 TRAIL <br />P16750.PP <br />TASK NO.TASK DESCRIPTION DIRECTOR SR. MANAGER DESIGN LEAD ENGINEER III ENGINEER II TECHNICIAN CLERICAL TOTALS EST. FEE <br />• Results/Findings <br />• Conclusions/Recommendations <br />• Additional Information (References Cited) <br />• Maps Depicting Surveyed Wetland Boundaries <br />• Wetland Determination Data Forms <br />• Site Photograph Log <br />• Antecedent Precipitation Data <br />Complete WCA/USACE Joint Application Form for wetland boundary/type <br />(Application). <br />Submit Report and Application to Client for review. <br />Revise Report and Application per Client comments (if necessary). <br />6.1.4 Agency Coordination for Wetland Boundary/Type Approval 0 2 10 2 0 0 0 14 $2,228 <br />Submit Report and Application to WCA LGU and USACE. <br />Attend TEP meeting in support of wetland boundary/type application approval. <br />Convert final approved wetland shapefiles to CAD and provide to Client. <br />6.2 30% Plans for City Review (Refined Concept Layout and Estimate following Alt <br />Review Meeting) <br />0 4 0 0 8 0 0 12 $1,796 <br />6.3 60% Plans & Estimate for City/County Review <br />6.3.1 Prepare 30% Comment Response Log 0 1 0 4 4 0 0 9 $1,239 <br />6.3.2 Civil Design 0 2 0 8 60 0 0 70 $8,978 <br />6.3.3 Water Resources Design & Coordination (60%) <br />6.3.3.1 Identify/confirm locations for BMP's to meet the RCWD rules along with enough <br />grading to confirm right-of-way impacts <br />2 0 6 0 12 0 0 20 $2,888 <br />6.3.3.2 Locate CB's within curb areas based on State Aid standards 0 0 6 0 12 0 0 18 $2,436 <br />6.3.3.2 Identify new storm sewer/conveyance needed to route to BMP's 0 0 6 0 12 0 0 18 $2,436 <br />6.3.3.3 Identify new culverts needed to convey water across trails system 0 0 4 0 12 0 0 16 $2,124 <br />6.3.3.4 Assemble 60% plans including drainage plans, BMP grading shapes, sample <br />sheets for tabulations and profiles. <br />0 0 12 0 24 0 0 36 $4,872 <br />6.3.3.4 Identify floodplain volume impacts due to the trail construction and locate <br />potential floodplain mitigation locations <br />0 0 2 0 8 0 0 10 $1,312 <br />6.3.4 Retaining Wall Design, Plans & Estimate 0 2 0 6 0 0 0 8 $1,208 <br />6.3.5 Assemble Submittal Documents and Forward to City/County 0 2 0 0 2 0 0 4 $648 <br />6.4 90% Plans & Estimate for City/County Review <br />6.4.1 Prepare 60% Comment Response Log 0 2 0 0 4 0 0 6 $898 <br />6.4.2 Civil Design 0 2 12 40 80 0 0 134 $17,670 <br />6.4.3 Water Resources Design & Coordination (90%) <br />6.4.3.1 Finalize grading plans for BMP's 0 0 2 0 6 0 0 8 $1,062 <br />6.4.3.2 Refine/finalize CB locations within curb areas based on State Aid standards 0 0 2 0 6 0 0 8 $1,062 <br />6.4.3.3 Finalize design for all storm sewer, including profiles as needed for State Aid 0 0 4 0 16 0 0 20 $2,624 <br />6.4.3.4 Assemble drainage plans including plan, profiles and special details 0 0 12 0 24 0 0 36 $4,872 <br />6.4.3.5 Assemble packagae for State Aid submittal 0 0 2 0 6 0 0 8 $1,062 <br />6.4.3.6 Assemble Division S specifrications for drainage related items 1 0 8 0 0 0 0 9 $1,474 <br />6.4.4 Retaining Wall Plans, Estimate & Special Provisions (PS&E) <br />- Wall Special Provisions prepared to be included in Division S prepared in other <br />tasks. <br />1 1 8 0 24 48 0 82 $11,489 <br />6.4.5 Assemble Submittal Documents and Forward to City/County 0 2 0 0 2 0 0 4 $648 <br />6.5 100% Plans & Estimate for City/County Approval <br />6.5.1 Prepare 90% Comment Response Log 0 2 0 0 4 0 0 6 $898 <br />6.5.2 Civil Design 0 2 8 2 24 0 0 36 $4,916 <br />6.5.3 Water Resources Design & Coordination <br />SRF CONSULTING GROUP, INC.ENGINEERS AND PLANNERS 16750.PP_Arden Hills Old Highway 10 Costs_edit 051823.xlsx <br />MINNEAPOLIS. MN