My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-12-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
06-12-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:36:16 AM
Creation date
6/9/2023 10:33:15 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/6/2023 Page 9 of 11 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:CITY OF ARDEN HILLS <br />Project:OLD HIGHWAY 10 TRAIL <br />P16750.PP <br />TASK NO.TASK DESCRIPTION DIRECTOR SR. MANAGER DESIGN LEAD ENGINEER III ENGINEER II TECHNICIAN CLERICAL TOTALS EST. FEE <br />Wetland boundary shapefiles in AutoCAD compatible format. <br />Wall Plans & Estimates: 60%, 90% and Final <br />Wall Special Provisions: 90% & Final <br />30/60/90/100 Submittals <br />Permit applications and supporting documentation ready for signature. <br />WCA/USACE Joint Application Form for aquatic resource impacts (electronic pdf <br />copy). <br />Draft wetland credit Purchase Agreement(s) and Withdrawal Transaction Form(s). <br />SUBTOTAL - TASK 6 10 42 231 110 388 56 0 837 $117,956 837 <br />140.9271 <br />7.0 Easement Documents <br />Assumptions: <br />SRF to prepare ROW base file, sketch graphics and compose legal descriptions <br />ROW acquisition by City <br />41 private parcels are located along the alignment proposed in the RFP <br />Client Deliverables: <br />Desired term length for temporary easements <br />7.1 Prepare ROW Base Fil 0 30 0 0 0 0 0 30 $5,970 <br />7.2 Sketch Parcel Graphics (10 parcels - .5 hr check, 1.5 hr draft x10)0 0 0 0 24 0 0 24 $3,000 <br />7.3 Compose Legal Descriptions (10 parcels - .5 hr check, .5 hr compose x 10)0 24 0 0 0 0 0 24 $4,776 <br />SRF Deliverables: <br />ROW Base File <br />Parcel Graphics <br />Legal Descriptions <br />SUBTOTAL - TASK 7 0 54 0 0 24 0 0 78 $13,746 78 <br />$176.23 <br />8.0 County/MnDOT Coordination <br />Assumptions: <br />County and City staff to prepare Cooperative Agreement for Construction <br />SRF to prepare cost participation summary and project location map to support <br />this document <br />SRF to participate in up to 2 coordination meetings with Ramsey County <br />Client Deliverables: <br />Example of previous Cooperative Agreement(s) for reference <br />SRF CONSULTING GROUP, INC.ENGINEERS AND PLANNERS 16750.PP_Arden Hills Old Highway 10 Costs_edit 051823.xlsx <br />MINNEAPOLIS. MN
The URL can be used to link to this page
Your browser does not support the video tag.