Laserfiche WebLink
Design Exceptions/ Notes: <br /> • Previous information indicated a hum coming from an electrical source. EDC investigated the <br /> hum but could not track it to the source. Best advice is to install a Wi-Fi system that would not <br /> be affected by this electrical interference. Cost of tracking down the source of the hum is hard <br /> to estimate and could become costly. <br /> • All network devices are programmed and fully tested at EDC on a dedicated and self- <br /> contained network using managed network parameters as provided by the Owner prior to <br /> installation. Additionally, EDC will provide all relevant network settings to the Owner's IT <br /> department if the newly provided audiovisual system is to reside on or is converged with the <br /> Owner's network. EDC is not responsible for troubleshooting the Owner's network or for <br /> delays due to integration issues beyond the project's contracted time allotment. If additional <br /> time is required, the Owner will be charged at the current hourly rates in the form of a change <br /> order. <br /> • It should be assumed that any equipment not designed by the manufacturer for mounting to <br /> the building structure requires stamped rigging drawings from a certified structural engineer. <br /> Unless otherwise stated, Electronic Design Company (EDC) has not included stamped <br /> equipment rigging drawings in this proposal and they are the responsibility of the Owner. <br /> However, EDC can facilitate in the design of a rigged system or provide drawings at an <br /> additional cost, upon request. <br /> Electronic Design Company shall: <br /> • Provide and install all equipment as designed. <br /> • Provide and install all wire, except ground wire. <br /> • Provide all final connections at system head-end. <br /> • Perform check-out and testing of system being installed. <br /> • Provide the owner with manuals and instruction. <br /> • Provide five-year warranty on parts and labor. <br /> Client or their Subcontractors shall: <br /> • Provide and install all ground wire. <br /> • Provide analog audio output from the DSP to act as input to the streaming audio server. Client <br /> will be responsible for configuring this output within the DSP. <br /> • Furnish electricity to head-end equipment as specified. <br /> • Electrical service for operation of this system, as well as conduit and high voltage cable, is NOT <br /> included in this quotation. <br /> Electronic Design Company will not be responsible for lost time or delays due to other parties or <br /> failure to gain access to work areas or systems. Unless other hours have been negotiated, all work will <br /> be completed during the normal business hours of 7:00 am and 3:30 pm; with the exception of <br /> normal holidays. Scheduling is subject to available personnel and product availability. Extra charges <br /> will be incurred by the customer if the project needs to be completed sooner than what is stated in <br /> the contract. <br /> * Price Includes <br /> '..- 3 of . <br /> Project No: 6-Z-•004 <br />