<br />Project Scope:
<br />
<br />Please note, installation is based on site being ready prior to our arrival to install play equipment as well as site conditions that have been conveyed
<br />to our organization by the owner/owner's representative and/or ideal conditions existing for a timely completion of your project as quoted. Unless
<br />addressed prior to the installation quote being issued or specifically mentioned herein, any issues that arise that impede the progress/completion of
<br />your project as quoted will result in additional charges.
<br />
<br />Weather can change project scheduling in many ways. Take rain for an example. Day, or days, before rain... If weather forecasts show a high
<br />percentage chance for rain that will effect the site conditions, a postponement may be in order. Digging holes, laying certain surfacing materials,
<br />etc., are greatly affected by weather conditions and work may not begin/continue due to weather forecasts. There's the rain days themselves, which
<br />if heavy enough rainfall occurs, makes a site unworkable. Day, or days, after rain... Drying time will be needed after rain and the number of days
<br />needed will vary depending on amount of moisture received. One actual rain day may equal multiple delay days depending on work scheduled to
<br />be done.
<br />+ INCLUSIONS +
<br />+ One mobilization
<br />+ Public utility locates only
<br />+ Installation of equipment
<br />+ Marking and digging of footings holes to accept direct embedment supports as needed
<br />+ Unpacking of play equipment
<br />+ Assembly of play equipment
<br />+ Concrete for footings as needed
<br />+ Pouring of concrete for footings
<br />+ Construction tape/temporary bracing (as needed)
<br />+ Standard insurance offerings
<br />+ Standard warranty offerings
<br />+ Standard industry accepted labor wages
<br />
<br />- EXCLUSIONS -
<br />- Clear access path up to and into play area for installation equipment (minimum of 8-foot wide, includes but not limited to gates, walkways,
<br />driveways, etc.)
<br />- Staging area for materials and installation equipment, trailers, etc.
<br />- Unobstructed space for maneuvering installation equipment as well as performing work
<br />- Security fencing of any type
<br />- On site security personnel
<br />- Engineered wood fiber (EWF) surfacing
<br />-Spreading of EWF - If fencing is in place (by others), ability to unlock fencing is to be provided to our office a minimum of one week prior to our
<br />start
<br />- Private utility locates such as, but not limited to, irrigation, fiber optics, private lighting, etc.
<br />- Accepting, unloading and storage of order(s)/shipment(s) prior to installation. Please note, orders can be packaged/shipped in large crates,
<br />pallets, etc., requiring heavy-duty equipment to unload.
<br />- Sitework of any kind such as, but not limited to, grading (play area to have max slope of 1%), site restoration, drainage, etc.
<br />- Removal of existing play equipment, border, safety surfacing, etc.
<br />- Backfill and compaction of backfill after removal of existing items (for footing holes as an example) that leave voids in area (marking and digging of
<br />new footing holes based on workable site)
<br />- Digging in compacted sub-surfaces, rock, hard pan, tree roots, unstable soil conditions, etc.
<br />- Restoration of compacted sub-surfaces for playground surfacings such as, but not limited to, poured-in-place rubber, rubber tiles, artificial turf, etc.
<br />- Digging/maneuvering in sand, pea gravel, mud, etc.
<br />- Offsite removal of spoils from footing holes (can be stockpiled near play area for owner/owner's representative removal or spread within play area)
<br />- Disposal of packing material (can be deposited in owner/owner's representative onsite dumpster or stockpiled for removal by others)
<br />- Playground safety surfacing
<br />- Border to help contain playground safety surfacing
<br />- Removal of temporary braces, caution/construction tape, etc. (Can be removed and disposed of after concrete has cured.)
<br />- Bonding of any type
<br />- Permits of any kind
<br />- Prevailing, Davis Bacon, Union, or similar, wages
<br />- Restroom facilities. Please provide access to restrooms whether within a building or portable style. Should use of site facilities not be available,
<br />Minnesota / Wisconsin Playground
<br />5101 Highway 55, Suite 6000
<br />Golden Valley, Minnesota 55422
<br />Ph. 800-622-5425 | 763-546-7787
<br />Fax 763-546-5050 | harlan@mnwiplay.com
<br />
<br />CONSULTANT: HARLAN LEHMAN
<br />04/17/2023
<br />Quote #
<br />103397-01-16
<br />Floral Park - Arden Hills, MN - D11620H1 -I
<br />Page 2 of 3
|