My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-10-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
07-10-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 2:58:11 PM
Creation date
7/6/2023 2:57:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION – JUNE 20, 2023 6 <br /> <br />Councilmember Monson wondered if they went the zoning route if they could do a simplified <br />version that THC edibles can only be sold in certain areas, or if they should write a full zoning law <br />around THC edibles plus adult cannabis. <br /> <br />Mayor Grant felt they should take a conservative approach and limit what they could. <br /> <br />Further discussion ensued. Council agreed to pursue zoning regulations for lower-potency THC <br />edibles and directed staff to bring a draft ordinance amendment to the July work session. <br /> <br />A. Arden Manor Park/Floral Park Improvements <br /> <br />Mayor Grant stated they are over budget by more than a little bit. Council is trying to figure out <br />if they should trim the project back or go forward with the entire project. <br /> <br />Councilmember Monson said they had talked about splitting off the hard court to be done in <br />2024 and wondered if they had looked more into that. <br /> <br />Public Works Director/City Engineer Swearingen said it was a possibility but the overall cost <br />savings wouldn’t be that significant because there is a cost to take it from the plan and integrate it <br />into another plan set. The cost savings would come from the bituminous, aggregate and sand <br />costs, with a total cost savings of around $20,000. <br /> <br />Councilmember Monson thought the hard court at Arden Manor didn’t look that bad. <br /> <br />Public Works Director/City Engineer Swearingen said the design is for a full reconstruct, <br />which is almost like building a road. They took soil borings and the design is based off of that <br />study. Floral Park’s courts would be similar but the court is in worse condition than Arden <br />Manor. <br /> <br />HR Green Project Engineer Jantscher reviewed the alternate solutions as shown in the staff <br />memo. <br /> <br />Councilmember Rousseau asked if there were items that the public preferred based on the <br />resident surveys. <br /> <br />Public Works Director/City Engineer Swearingen felt there was preference toward the hard <br />courts as everyone wants pickleball. Floral Park gets used for tennis and Arden Manor gets a lot <br />of use for basketball. The charts show the most feasible elements to remove without impacting <br />the rest of the costs. If they didn’t move forward with constructing a new shelter at Floral Park <br />he’d still like to remove the existing shelter due to the shape that it’s in. <br /> <br />Councilmember Holden noted the grant for Arden Manor included the shelter and playground <br />structure. <br /> <br />Public Works Director/City Engineer Swearingen said that was correct, and the hard court was <br />added to the project during design. The hard court is due for a resurfacing. They could look at a <br />lighter solution for the surface but the next step is really some type of rehab. <br />
The URL can be used to link to this page
Your browser does not support the video tag.