CHANGE ORDER <br />Distribution: <br />Owner <br />Engineer <br />2550 University Avenue W. Suite 400N Contractor <br />St. Paul, MN 55114 Field <br />(651) 644-4389 Other <br />The contract is changed as Follows: <br />2575.508 SEED MIXTURE 25-131 POUND 139.19$ -29.00 -$4,036.51 <br />-515.0014.46$ SQ YDACRYLIC COLOR SURFACING2582.604 -$7,446.90 <br />2574.508 FERTILIZER TYPE 3 LIN FT 0.60$ -24.00 -$14.40 <br />2575.508 HYDRAULIC MULCH MATRIX LIN FT 5.11$ -273.00 -$1,395.03 <br />2557.603 4' HIGH, 3-RAIL CHAIN-LINK PERIMETER FENCE LIN FT 140.00$ -10.00 -$1,400.00 <br />2573.503 SILT FENCE, TYPE MS LIN FT 3.85$ -502.00 -$1,932.70 <br />2557.602 10' HIGH, 10' WIDE DOUBLE GATE EACH 1,425.00$ -1.00 -$1,425.00 <br />2557.603 10' HIGH, 3-RAIL CHAIN-LINK PERIMETER FENCE LIN FT 85.00$ -272.00 -$23,120.00 <br />2521.603 5" THICK x 18" WIDE CONCRETE MAINTENANCE STRIP LIN FT 34.34$ -294.00 -$10,095.96 <br />2540.602 INSTALL BASKETBALL GOAL AND POST EACH 1,445.00$ -2.00 -$2,890.00 <br />9.76$ -500.00 -$4,880.00 <br />2502.602 4" PVC PIPE DRAIN CLEANOUT EACH 498.68$ -6.00 -$2,992.08 <br />June 27, 2023 <br />HR Green, Inc. <br />July 5, 2023 <br /> Project: Arden Manor Park and Floral Park Improvements <br />20-PARK-003; 22-PARK-001 <br />1 <br />Project No. <br />Date <br />Change Order No. <br />Chisago City, MN 55013 <br />8326 Wyoming Trail <br />Peterson Companies, Inc. <br />To Contractor: <br />Original Contract Date <br />Removal of the hard court improvements at Arden Manor Park as decided by Owner. <br />2021.501 MOBILIZATION <br />Unit <br />LUMP SUM -$6,805.00 <br />Unit Cost Quantity <br />Change Sub-TotalDescriptionItem <br />Number <br />-$6,805.00 0.00 <br />2211.507 AGGREGATE BASE (CV) CLASS 5 CU YD 44.05$ -125.00 -$5,506.25 <br />-$115,649.89 Total Cost <br />$816,523.35 <br />2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,C) TON 138.60$ -87.00 -$12,058.20 <br />2502.503 4" PE PIPE DRAIN LIN FT 24.72$ -36.00 -$889.92 <br />2502.503 4" PERF PE PIPE DRAIN LIN FT <br />$0.00 <br />$816,523.35 <br />The original (Contract Sum) was <br />Net change by previously authorized Change Orders <br />The (Contract Sum) prior to this Change Order was <br /> May 15, 2024The date of Final Completion as of the date of this Change Order therefore is <br /> Peterson Companies, Inc. <br /> Contractor Owner's Representative <br />NOT VALID UNTIL SIGNED BY THE CONTRACTOR, OWNER'S REPRESENTATIVE, if applicable, AND OWNER <br />The (Contract Sum) will be increased by this Change Order in the amount of <br />The new (Contract Sum) including this Change order will be <br />The Contract Time will be (increased) by 0 Days <br />($115,649.89) <br />$700,873.46 <br /> By: <br /> Owner <br /> HR Green, Inc. City of Arden Hills <br /> Date: 6/29/23 Date: <br /> By: By: <br /> Date: <br />-$2,079.00 <br />2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 2.51$ -560.00 -$1,405.60 <br />2104.503 REMOVE CHAIN LINK FENCE LIN FT 7.00$ -297.00 <br />-$562.66 <br />2106.507 COMMON EMBANKMENT (CV) CU YD 6.88$ -107.00 -$736.16 <br />2104.602 REMOVE BASKETBALL GOAL AND POST EACH 281.33$ -2.00 <br />-$1,816.32 2108.504 GEOTEXTILE FABRIC TYPE 5 SQ YD 3.52$ -516.00 <br />-$6,779.80 <br />2106.507 SELECT GRANULAR EMBANKMENT (CV) CU YD 35.20$ -437.00 -$15,382.40 <br />2106.507 EXCAVATION - COMMON CU YD 12.44$ -545.00 <br />\\hrgreen.com\HRG\Data\2021\211646\Construction\Change_Management\Change_Orders\CO-01-Remove_Arden_Manor_court\CO-01.xlsx <br />7/5/23 <br /> Attachment B