Laserfiche WebLink
Proposed LAKE JOHANNA FIRE DEPARTMENT <br />2024 Capital Budget <br />Printed 6/21/2023 <br />Formulas <br />Enter data <br />Ladder (1996) Tahoe (2017)Rescue (2014)Engine (2008) <br />Tahoe (2019) <br />Rescue (2017) <br />Tahoe (2019) <br />Tanker (2001) <br />Engine (L143)Rescue (New) <br />Line General Equipment 2024 2025 2026 2027 2028 2029 2030 <br />1Engine/Ladder Replacement 1,844,000 960,000 1,060,000 <br />2 Rescue Replacement 300,000 330,000 363,000 <br />3 Tahoe/Command Replacement 100,000 105,000 110,000 <br />4 Tanker/Utility Replacement 400,000 <br />5 SCBA Replacement 720,000 <br />6Tire replacement 8,000 8,500 8,500 9,000 9,000 9,500 9,500 <br />7Computer Replacement 5,000 11,200 3,000 20,500 <br />8 Mobile Tablet Replacement 58,500 81,200 <br />9 Network Access Devices (all Stations)2,400 8,000 <br />10 Fire Hose 1-3/4" and 4" hydrant <br />11 800MHz Radio Optimization 4,300 <br />12 Hydro Test of SCBA Bottles 122 x$26 5,500 <br />13 Graphics (1999 Utility & 2007 Ladder) <br />14 Thermal Imaging Camera <br />15 Medical Supplies/Bags <br />16 Rehab Equipment <br />17 Gas Monitors (CO) <br />18 Hydraulic Rescue Tool (New Apparatus)14,000 42,000 <br />19 Lifting Air Bags Replacement <br />20 Second Set Of Gear <br />21 Portable Monitor/Nozzle 7,000 <br />22 New Ladder Equipment 24,000 <br />23 2007 Utility Center Console 2,000 <br />24 Lexipol - Policy Manual 27,914 10,811 <br />25 Set of Irons 3,500 <br />Totals 1,999,414$ 132,911$ 1,028,500$ 1,131,300$ 849,000$ 1,150,700$ 393,000$ <br />Cities' Share of Capital Budget <br />Arden Hills 24.9% 497,854$ 33,095$ 256,097$ 281,694$ 211,401$ 286,524$ 97,857$ <br />North Oaks 14.4% 287,916$ 19,139$ 148,104$ 162,907$ 122,256$ 165,701$ 56,592$ <br />Shoreview 60.7% 1,213,644$ 80,677$ 624,300$ 686,699$ 515,343$ 698,475$ 238,551$ <br />Total 100.0% 1,999,414$ 132,911$ 1,028,501$ 1,131,300$ 849,000$ 1,150,700$ 393,000$