My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-23 Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Karth Lake Improvement District Board
>
Karth Lake Agendas
>
2023
>
07-11-23 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2023 8:23:51 AM
Creation date
7/7/2023 8:23:44 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
task order <br />Matthew Kocian <MKocian@ricecreek.org> <br />Tue 4/11/2023 3:56 PM <br />To:Renee Marino <renee@cupitorconsulting.com> <br />Hello Renee, <br /> <br />See below for the text from our agreement with Houston Engineering. Note – it might be later May or early June. <br /> <br />Houston Engineering Project No.: R005555-0338 <br />Task Order Purpose: The task order purpose is to develop a basic spreadsheet calcula on model for the pumping <br />opera ons of Karth Lake. The spreadsheet model will be delivered to the Karth Lake Improvement District (KLID) <br />for their use in developing pumping and lake level management metrics. <br />Professional Services Rendered: HEI intends to provide the following professional services during the comple on <br />of this Task Order: <br />1. Verify storage curve for Karth Lake. Bathymetry data will be added to the storage curve if KLID can provide the <br />bathymetry data. <br />2. Review pump ra ng curves for the exis ng Karth Lake pumps supplied by KLID. <br />3. Extract Karth Lake inflow data from the exis ng DWMP XPSWMM model. <br />4. Develop a spreadsheet calcula on model (Model) for simula ng various scenarios based on inflow volume, <br />available storage volume, pump ra ng curves, and various on/off eleva ons for the pumping opera ons. <br />5. Dra a technical memorandum explaining how to use the Model, the Model inputs, and limita ons of the <br />Model. <br />6. Two (2) coordina on mee ngs (virtual) with KLID and/or RCWD. <br />Deliverables: The deliverables for the Task Order include: <br />• Spreadsheet calcula ons model (Model) for Karth Lake pumping scenarios <br />• Dra and final technical memorandum <br />Schedule and Compensa on: HEI will perform the professional services iden fied above on a me and materials <br />basis up to the not-to-exceed amount of. HEI shall not exceed this amount for the comple on of this work without <br />prior authoriza on from the District Administrator. The work will be completed no later than May 15, 2023. <br /> <br /> <br /> <br /> <br /> <br />Ma Kocian <br />Lake and Stream Program Manager <br />Rice Creek Watershed District <br />763.398.3075 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.