My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-20-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2023
>
06-20-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2024 8:40:07 AM
Creation date
7/11/2023 11:11:18 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION — JUNE 20, 2023 8 <br />make it playable for another year. That doesn't save a huge amount of money but it is the general <br />consensus. <br />Public Works Director/City Engineer Swearingen said they would negotiate with the <br />contractor and bring the item back to Council for approval at the next meeting with an explanation <br />of where they are at with the contract costs. <br />Councilmember Fabel left the meeting at 6:27 p.m. <br />B. 2024 PMP Street and Utility Improvements <br />Bolton & Menk Principal Engineer Waltman discussed the scope of work that included <br />pavement resurfacing, water quality infrastructure improvements, storm sewer repairs and <br />replacement of some undersized watermain. He showed maps of the north and south sections of <br />the project area and described the work to be done in each area, including a number of pond <br />cleanouts and installation of sump structures. <br />Public Works Director/City Engineer Swearingen explained they are starting to clean out <br />ponds along with the PMPs. Ponds are designed to be addressed every 20-25 years, and dredging <br />is expensive so that's why they are adding the SAFL baffles to mitigate future needs for pond <br />dredging. There are currently about a dozen installed around the lakes. <br />Bolton & Menk Principal Engineer Waltman further discussed the James Avenue portion of <br />the project that included a full reclamation and watermain replacement. They will also be <br />installing five parallel parking stalls along Royal Lane at Floral Park, and making some trail and <br />retaining wall improvements. <br />Bolton & Menk Principal Engineer Waltman stated roughly 160 properties in the project area <br />received a resident questionnaire. Sixty-six responses were received. Residents noted the trail <br />system needed resurfacing, there were concerns over impacts to irrigation systems and dog fences, <br />project assessments, minimizing impacts and crime during construction, driveway slopes and <br />drainage issues. <br />Public Works Director/City Engineer Swearingen explained some of the work being done with <br />drainage on certain sections of Dawn Avenue. <br />Bolton & Menk Principal Engineer Waltman reviewed the summary of preliminary estimated <br />costs with a total of $3,030,000, and how they determine their estimates. <br />Discussion ensued regarding special assessments. <br />Bolton & Menk Principal Engineer Waltman explained the process required for the assessment <br />process including a feasibility report, engineered plans, two public hearing and competitive bids. <br />There will be mailed notice of public hearings, resident open houses and notice of the public <br />assessment hearing. He reviewed the project schedule and next steps. <br />Councilmember Holden asked if reclamation is done and then a mill and overlay, and she didn't <br />want the contractor to do mill and overlay and then do reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.