My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
07-17-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2023 10:41:05 AM
Creation date
7/13/2023 1:58:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota <br />Project # 24-Sew-002 <br />Project Name Sewer Lining/Rehabilitation <br />2024 thru 2028 <br />Department Sanitary Sewer Department <br />Contact Public Works Director <br />Type Maintenance <br />Useful Life 30 <br />Category Sanitary Sewer Maintenance <br />TCAAP No Priority 2 Very Important <br />Description Total Project Cost: $2,430,000 <br />Sewer Lining and Rehabilitation of the sanitary sewer system on a 2-year cycle. <br />(2024): Arden View Drive Neighborhood <br />(2025): Glen Arden Neighborhood <br />(2027): Venus Avenue Neighborhood <br />(2029): Lift Station 2 Service Trail <br />(2031): Hamline Avenue, Eide Circle, Floral Park connection <br />(2033): In erson Neighborhood <br />Justification <br />As part of our sanitary sewer program, lines found with holes and cracks allowing for infiltration should be lined or repaired as needed. As the <br />sewer infrastructure is aging, staff will continue to perform sewer inspections and identify locations needing sewer lining and other sewer <br />Expenditures <br />2024 <br />2025 2026 <br />2027 2028 <br />Total <br />Construction/Maintenance <br />415,000 <br />400,000 <br />640,000 <br />1,455,000 <br />Total <br />Funding Sources <br />415,000 <br />2024 <br />400,000 <br />2025 2026 <br />640,000 <br />2027 2028 <br />1,455,000 <br />Total <br />Sanitary Sewer Utility Fund <br />415,000 <br />400,000 <br />640,000 <br />1,455,000 <br />Total <br />415,000 <br />400,000 <br />640,000 <br />1,455,000 <br />project will help the overall I&I reduction program. <br />Produced Using the Plan -It Capital Planning Software <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.