Laserfiche WebLink
Capital Improvement Plan 2024 thru 2028 <br />City of Arden Hills, Minnesota <br />Project # 28-Str-001 <br />Project Name 2028 PMP <br />TCAAP No <br />Department Street Department <br />Contact Public Works Director <br />Type Improvement <br />Useful Life 20-25 <br />Category Streets: Reconstruction <br />Priority 2 Very Important <br />Description I <br />Total Project Cost: $3,765,000 <br />?avement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous <br />)avement, repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs. Street segments include: <br />3enton Way loop south of Harriet, Tiller Lane (Lexington to Cannon Ave), Cannon Ave (Tiller Ln to Dunlap), Dunlap (Cannon Ave to Tiller <br />: ane), Ingerson Rd, Ingerson Ct, Hamlin Ave N (Hamlin Ave N to Ingerson Rd), Pine Tree Dr, Harriet Ave, Walden Pl, Lametti Ln, Lametti Ct, <br />3ussard Ct, Hunters Ct, Fernwood St, Fernwood Ct, Dellwood Ave and Carlton Dr. Dredging Fernwood sediment pond and adding grit chambers, <br />)ipe lining dual storm crossing Hamline Ave N and 2-400 ft sanitary sewer 10-inch forcemain rehab. <br />Justification <br />?avement conditions are showing distress with condition ratings from 15 to 59. Pavement conditions will continue to decline. Proposed <br />mprovements are necessary to continue safe and reliable street and utility services. These improvements will address the increasing costs for <br />)atching and maintaining highly deteriorated street pavement within the City. <br />Expenditures 2024 <br />2025 2026 2027 2028 <br />Total <br />Construction/Maintenance <br />3,765,000 <br />3,765,000 <br />Total <br />3,765,000 <br />3,765,000 <br />Funding Sources 2024 <br />2025 2026 2027 2028 <br />Total <br />Capital Improvement Funds <br />775,000 <br />775,000 <br />(PIR) <br />Other <br />1,200,000 <br />1,200,000 <br />Sanitary Sewer Utility Fund <br />340,000 <br />340,000 <br />State Aid <br />350,000 <br />350,000 <br />Surface Water Mgmt Utility <br />950,000 <br />950,000 <br />Funds <br />Water Utility Funds <br />150,000 <br />150,000 <br />Total <br />3,765,000 <br />3,765,000 <br />Budget Impact/Other <br />Produced Using the Plan -It Capital Planning Software <br />53 <br />