My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-17-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
07-17-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2023 10:41:05 AM
Creation date
7/13/2023 1:58:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2024 thYu 2028 Department Water Department <br />City of Arden Hills, Minnesota Contact Public Works Director <br />Project # 26-W-003 Type Unassigned <br />Useful Life 10 <br />Project Name Trunk Water Main Improvements Category Utility Maintenance <br />TCAAP No Priority 2 Very Important <br />Description Total Project Cost: $40,000 <br />Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020-2021. <br />The evaluation will develop a long-term plan for rehabilitation of this critical water main segment. Inspection via ultrasonic testing is needed to <br />evaluate existing conditions in critical locations along the Trunk Watermain. <br />2026 - Evaluation at Hamline Ave N near Ingerson and Dunlap St N near Ingerson <br />2028 - Inspections and testing at Dunlap St N near Grey Fox Road <br />Justification <br />The trunk water main extending between the north and south elevated storage tanks is one of the most important and critical segments of the water <br />distribution system for supplying water to the northern portion of the City. Segments of the water main have been in service for more than 52 yeat <br />Expenditures 2024 <br />2025 2026 2027 <br />2028 <br />Total <br />Construction/Maintenance <br />20,000 <br />20,000 <br />40,000 <br />Total <br />Funding Sources 2024 <br />20,000 <br />2025 2026 2027 <br />20,000 <br />2028 <br />40,000 <br />Total <br />Water Utility Funds <br />20,000 <br />20,000 <br />40,000 <br />Total <br />20,000 <br />20,000 <br />40,000 <br />Budget Impact/Other <br />Produced Using the Plan -It Capital Planning Software <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.