My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-24-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
07-24-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2023 6:10:07 PM
Creation date
7/20/2023 2:58:40 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AA/EOE <br />Braun Intertec Corporationp <br />11001 Hampshire Avenue S <br />Minneapolis, MN 55438 <br />Phone: 952.995.2000 <br />Fax: 952.995.2020 <br />Web: braunintertec.com <br />April 20, 2023 Project B2204011.00 <br />Brad Fisher, PE <br />Bolton & Menk, Inc. <br />12224 Nicollet Avenue <br />Burnsville, MN 55337 <br />Re: Addendum 1 to Geotechnical Evaluation <br />Additional Geotechnical Services – Arden Hills 2024 PMP <br />James Avenue <br />Arden Hills, Minnesota <br />Dear Mr. Fisher: <br />This letter serves as Addendum 1 to our Geotechnical Evaluation Report for this project under Project <br />Number B2204011, dated June 23, 2022. This Addendum addresses the results of the most recent <br />borings requested for James Avenue and provides recommendations for utility installation. <br />Background <br />Our Geotechnical Evaluation Report for the project provided both full-depth reclamation (FDR) and mill- <br />and-overlay recommendations for the project. For the original project, James Avenue was limited to one <br />pavement core for evaluation. Based on the core thickness and condition, the mill-and-overlay approach <br />was recommended for James Avenue. <br />New Information <br />We understand the proposed rehabilitation method on James Avenue in the project area was changed <br />from a mill-and-overlay approach to a full reconstruction due to the City’s need to replace the <br />watermain. Two soil borings, denoted as ST-8 and ST-9, were requested to provide additional <br />geotechnical information along James Avenue. <br />Boring Results <br />Table 1 provides a summary of the soil boring results; in the general order we encountered the strata. <br />Please refer to the attached Log of Boring sheets for additional details. The attached Descriptive <br />Terminology sheet includes definitions of abbreviations used in Table 1.
The URL can be used to link to this page
Your browser does not support the video tag.