My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-14-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:49:51 PM
Creation date
8/10/2023 3:46:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION — JULY 17, 2023 8 <br />LJFD Capital Items are the City's share of the fire department budget. Lift Stations #5 and #2 <br />costs will come out of the Sewer Fund. <br />Discussion ensued regarding past and future lift station repairs and Sewer Fund expenses. <br />Finance Director Bauman continued with the Sewer Lining/Rehab project that was moved to <br />2024 because that is when I&I will be available again to help cover part of the cost of that project. <br />The 2024 PMP will be covered by PIR Fund, Utilities and assessments. The south water tower <br />maintenance is covered by the Water Fund. <br />Councilmember Holden asked about water tower security. <br />Public Works Director/City Engineer Swearingen said he was anticipating bringing that <br />forward to a future meeting. <br />Finance Director Bauman said Water Meter Replacement is being proposed over two years, <br />2024 and 2025. That project can be re-evaluated as it gets closer. Trunk Water Main <br />Improvements to upgrade the Roseville water main to support future TCAAP development will <br />hopefully be paid back through WAC charges from the TCAAP site. MN-51 Water and Sewer <br />Crossings project will be over two years, 2024 and 2026 and money will come from the Water and <br />Sewer Funds. <br />Public Works Director/City Engineer Swearingen explained the first year would be a <br />feasibility study to see the actual needs and the amount in the budget is assuming all of the <br />crossings would need to be replaced or rehabilitated. <br />Mayor Grant asked if the WAC charges from the Thumb parcel at TCAAP would be able to <br />cover the expense of upgrading the Roseville water main. <br />City Administrator Perrault said WAC is estimated for the whole TCAAP property but he can <br />check on how many they can expect for that area. <br />Finance Director Bauman said they could take questions on the 2024 Equipment purchases list. <br />Councilmember Holden asked why the Ford Escape needed to be replaced. <br />Public Works Superintendent Frid said there was some corrosion but if the Building <br />Department was OK with it he had no problem waiting to replace it. He explained the equipment <br />replacement guidelines and cycles. <br />Mayor Grant said they have essentially doubled the CIP budget for equipment. He asked what <br />they would do on the Equipment Replacement list if they were told to maintain the previous <br />budget amount from 2023-2027. <br />Public Works Director/City Engineer Swearingen said the biggest difference between the years <br />is they have a Fleet Management Lead so there is someone dedicated to looking at every piece of <br />equipment and organizing it on a spreadsheet, so they have something they didn't have last year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.