Laserfiche WebLink
B RAU N <br />INTERTEC <br />The Science You Build On. <br />July 27, 2023 <br />Mike Waltman, PE <br />Bolton & Menk, Inc. <br />12224 Nicollet Avenue <br />Burnsville, MN 55337 <br />Re: Proposal for a Geotechnical Evaluation <br />Arden Hills Forcemain Rehabilitation <br />Stowe Avenue to Country Rd E <br />Arden Hills, Minnesota <br />Dear Mr. Waltman: <br />Braun Intertec Corporation <br />11001 Hampshire Avenue S <br />Minneapolis, MN 55438 <br />Proposal QTB182081 <br />Phone: 952.995.2000 <br />Fax: 952.995.2020 <br />Web: braunintertec.com <br />Braun Intertec Corporation is pleased to submit this proposal to complete a geotechnical evaluation for <br />the above -referenced project. <br />Project Information <br />Per your e-mail and provided plan, we understand the proposed project will include trenchless forcemain <br />improvements below the walking path alignment between Stowe Avenue and Country Rd E, then parallel <br />to Country Rd E, with a total improvement length of about 2,400 feet. <br />Purpose <br />The purpose of our geotechnical evaluation will be to characterize subsurface geologic conditions <br />at selected boring locations, evaluate their impact on the project, and provide geotechnical <br />recommendations for the design and construction of the Arden Hills Forcemain Rehabilitation Project. <br />Scope of Services <br />We propose the following tasks to help achieve the stated purpose. If we encounter unfavorable or <br />unforeseen conditions during the completion of our tasks that lead us to recommend an expanded scope <br />of services, we will contact you to discuss the conditions before resuming our services. <br />Site Access and Permitting <br />It appears the potential boring locations will be accessible to a Geoprobe drill rig. We assume there will be <br />no cause for delays in accessing the boring locations. We are not including tree clearing, debris, or <br />obstruction removal, grading of navigable paths, or snow plowing. <br />Due to overhead power along the walking path and electrical easement proposed for the forcemain <br />alignment, we will have to offset our boring locations to adjacent streets. <br />Depending on access requirements, ground conditions, or potential utility conflicts, our field crew may <br />alter the boring locations from those proposed to facilitate accessibility. <br />AA/EOE <br />