My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-14-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:49:51 PM
Creation date
8/10/2023 3:46:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bolton & Menk, Inc. <br />Proposal QTB182081 <br />July 27, 2023 <br />Page 3 <br />necessary to our analyses, we anticipate performing six moisture content tests, two mechanical analyses <br />(through a #200 sieve only), and one organic content test. <br />Engineering Analyses <br />We will use data obtained from the boring and laboratory tests to evaluate the subsurface profile and <br />groundwater conditions, and to perform engineering analyses related to utility design and performance. <br />Report <br />We will prepare a report including: <br />■ A CAD sketch showing the boring locations. <br />■ Logs of the borings describing the materials encountered and presenting the results of our <br />groundwater measurements and laboratory tests. <br />■ A summary of the subsurface profile and groundwater conditions. <br />■ Discussion identifying the subsurface conditions that will impact design and construction. <br />■ Discussion regarding the reuse of on -site materials during construction. <br />■ Recommendations for preparing utility subgrades, and the selection, placement, and <br />compaction of fill. <br />■ Soil parameters for retaining systems at potential utility pits. <br />We will submit an electronic copy of our report to you. <br />Schedule <br />We anticipate performing our work according to the following schedule: <br />■ Drill rig mobilization — about 5 weeks after authorization; anticipated September or <br />October 2023. <br />■ Field exploration —1 day on site to complete the work. <br />■ Classification and laboratory testing — within 1 week after completion of field exploration. <br />■ Preliminary results — within 1 week after completion of field exploration. <br />■ Draft report submittal — within about 2 weeks of the completion of fieldwork. <br />■ Final report submittal — within 1 week of receiving comments on the draft report. <br />If we cannot complete our proposed scope of services according to this schedule due to circumstances <br />beyond our control, we may need to revise this proposal prior to completing the remaining tasks. <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.