My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-14-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:49:51 PM
Creation date
8/10/2023 3:46:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Open House <br />August 8, 2023 <br />• What We Heard <br />to General Support for the Project and <br />the Proposed Improvements <br />• Questions on How Streets Were <br />Determined for M&0 vs. Reclamation <br />• Questions Regarding Access & What <br />To Expect During Construction <br />• Questions Regarding the Assessment <br />Calculation Methodology <br />PUBLIC OPEN HOUSE INFORMATION Q BOLTON <br />2024 PMP Street &Utility Improvements &MEN K <br />-AF,,D N Hins August o 2023 <br />IV.J�C1V,11 6:00 p.m. to 7:30 p.m. Real People. Rea€Solutions. <br />Arden Hills City Hall <br />The City of Arden Hills is planning for a construction project to improve and sustain infrastructure at several locations next <br />summer. The project areas proposed to be included in the 2024 PMP Street & Utility Improvements Project are displayed at <br />this open house and are available on the project website. In general, the work entails: <br />• Street pavement rehabilitation (reclamation or mill and overlay) <br />o Spot concrete curb & gutter replacement <br />o Storm sewer repairs and water quality infrastructure improvements (trap sediment prior to outlet) <br />o Sanitary sewer repairs and I&I improvements <br />o Watermain repairs, including watermain replacement on James Avenue to upsize to 8-inch <br />• New parallel parking bay along Royal Lane at Floral Park <br />• Pond dredging cleanouts (removes accumulated sediment) <br />• Trail rehabilitation (pedestrian ramp & retaining wall improvements) <br />OSpecial assessments are proposed in accordance with City policy to fund a portion of the street improvements. <br />Property owners to whom special assessments apply received a public hearing notice. <br />The project website will be updated throughout the project development with project related information: <br />hnas://www.ciryofardeabills,orp/l201 /2024-PMP-Street-and-Utility-Improvements <br />Another public information meeting will be held in the spring with additional details on construction and the final <br />assessments. Members of the project team are listed below to assist you throughout the project duration. <br />M & MLENK <br />Real People. Real Solutions. <br />lt <br />EN HILLS <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.