My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-14-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:49:51 PM
Creation date
8/10/2023 3:46:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-inch diameter copper pipe to individual residences. Curb stops and boxes will be installed <br />at the ROW where the new service pipe connects to the existing service pipe. <br />Beyond James Avenue, watermain improvements will include replacement of select leaky <br />gate valves and boxes and adjusting the remaining gate valve boxes within the project <br />pavement areas to final grade to provide a smooth/drivable street surface in conjunction with <br />the street resurfacing portion of the project. Some damaged valve box tops may require <br />replacement. <br />See Figures 2 and 3 in Appendix A for the proposed utility improvements. <br />D. Storm Sewer <br />Based on the existing storm sewer age, size, and performance, the existing storm sewer was <br />found to be in generally good condition. Storm sewer improvements will include <br />rehabilitations at select locations including CIPP lining, minor pipe replacement, structure <br />replacements, rings and casting replacement, re -mudding of structures/inverts, drainageway <br />channel re -grading, rip rap replacement/installation, and storm sewer apron improvements. <br />Some of the work identified will be taking place outside of the roadway area in easements <br />that include behind houses. Access to these areas may be difficult and will necessitate tree <br />removal and restoration of temporary access impacts, including private landscaping facilities <br />in some areas. <br />Stormwater quality improvements will also be implemented to help remove sediments and <br />pollutant loads to the downstream system. This will include the replacement of the last storm <br />sewer structure in the street prior to its outfall into a stormwater pond or drainageway. This <br />structure will be replaced with a new structure that includes a sump and SAFL Baffle to <br />capture sediment from continuing downstream. This will allow city maintenance staff to <br />easily access the structure and vac out accumulated sediment. Work on the storm sewer catch <br />basin structures within the existing concrete curb and gutter will additionally require the spot <br />replacement of the adjacent concrete curb and gutter surrounding the catch basin castings. <br />Proposed storm sewer improvements on James Avenue include the full replacement of the <br />storm sewer to accommodate the watermain replacement. Additional storm sewer <br />improvements are proposed along the trail adjacent to 4242 Norma Avenue based on a <br />preliminary design provided by city staff. This work is intended to capture sediment <br />south/southeast of the property and route it to the storm sewer system as opposed to following <br />the current overland drainage path that generates stormwater issues at the property. This work <br />will require the removal of several trees in the area to construct the improvements. <br />Beyond the work identified above, the remaining storm sewer manhole castings within the <br />pavement of the project areas will be adjusted to final grade to provide a smooth/drivable <br />street surface in conjunction with the street resurfacing portion of the project. Some damaged <br />castings may require replacement. This work will include the replacement of all concrete <br />adjustment rings for each applicable manhole structure within the pavement limits. <br />See Figures 2 and 3 in Appendix A for the proposed utility improvements. <br />E. Stormwater Ponds <br />The two stormwater ponds identified by city staff to have collected significant sediment <br />accumulation over time which has reduced their working capacities are proposed to be <br />dredged as part of the project. The proposed pond dredging will reestablish the originally <br />designed pond volume. The first pond is located between McClung Drive and Briarknoll <br />Circle, just north of the bituminous trail. The second pond is located south of Colleen <br />Avenue, just west of Hamline Avenue North, however, only a portion of this pond is within <br />Prepared by: Bolton & Menk, Inc. PROPOSED IMPROVEMENTS <br />2024 PMP Street & Utility Improvements I OT1.130168 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.