Laserfiche WebLink
<br />, <br /> <br />,. <br /> <br />and storm drainage facilities on Connelly Avenue generally <br />located east of Snelling Avenue, south of the Soo Line Railroad, <br />north of County Road E and generally west of McGuire's. <br /> <br />MAYOR CREPEAU: At this time I'll ask our fiscal consul- <br />. tant, Mr. Peter Popovich, to explain the financing. <br /> <br />MR. POPOVICH: The total cost of this improvement is <br />$8l,823.00, of which $67,110.00 is street cost and $14,713.00 <br />is storm sewer cost. There are 6. 3 acres bene fi ting from the <br />storm sewer improvement. The project is assessed at 100%. It <br />will amount to $36.85 per front foot for the street improvement, <br />and $2,335.40 per acre for the storm sewer portion of the <br />project. Aqain, this will be spread over 20 years with the 8% <br />carrying charge with the usual right of prepayment. <br /> <br />The l4ayor announced that the meeting was open for the <br /> <br />consideration of objections, if any, to said proposed assess- <br /> <br />ment. All persons present were then given the opportunity to <br /> <br />present oral objections, and all written objections theretofore <br /> <br />filed with the City Clerk Administrator were presented and con- <br /> <br />sidered, and all such objections were tabulated as follows: <br /> <br />Mrs. Charlotte MCNiesh, Clerk Administrator, presented a <br />letter dated August 21 from John Rysgaard relating to the <br />property at 1253 West Connelly. Mr. Rysgaard said that no ten- <br />tative plan or design was submitted for his acceptance or <br />review and he felt the following deficiencies were unacceptable: <br /> <br />1. No provision was provided for the utilization of his <br />off-street parking area required by the village under his orLgi- <br />nal construction planning. <br /> <br />2. Insufficient access was provided in the curb opening <br />for driveway access to the yard portion to allow inqress and <br />egress of the semi-trailers. <br /> <br />3. Has received a notice of the assessment hearing to be <br />held on August 28 but has no record of having been advised in <br />advance of this project for any hearing. Therefore, he was <br />not aware that any part of the Flaherty - Connelly Street <br />improvement would affect him physically or monetarily and he <br />denied any liability for costs incurred. <br /> <br />. <br /> <br />In addition, it would be necessary that the curb be in- <br />stalled in such a manner to not cause him damages. <br />