My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-21-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
08-21-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:09:10 AM
Creation date
8/18/2023 8:07:49 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We are also currently working with the St Paul Port Authority in their development of the former <br />Hillcrest Golf Course named “The Heights”. <br />Your Vision <br />The Rice Creek Commons master plan lays out a vision for the site to create economic prosperity, build <br />an inclusive economy and develop an energy-forward community by providing much-needed housing at <br />a variety of price points – including deeply affordable housing – and creating well-paying jobs. <br />With 427 acres cleaned and revitalized, Rice Creek Commons will create significant economic and social <br />opportunity for Ramsey County, City of Arden Hills and the entire Twin Cities metro area. <br />Our Vision <br />We would request to have the 62-acre Primer Tracer site zoned I-2. We would request exterior storage <br />as a Condition Accessory Use Permit. <br />We have had serious discussions with a developer wanting to use a portion of the site as a Solor Energy <br />Generation Site. <br />We view this site as a future home for businesses that will be providing services for the 427 acres of <br />residential and commercial development. This large community will demand services such as electrical, <br />plumbing, carpentry, landscaping, snow removal, auto repair, and many, many other services. Bolander <br />is a union contractor providing our employees with a livable wage and benefits. <br />It is important to plan for revenue producing property that can complement the large development. In <br />the 2013 TCAAP project, Bolander recycled thousands of tons of concrete and asphalt materials. We <br />produce a MNDOT specified material that is reused as road base and parking lot gravel. We would set <br />up a recycling center that would provide aggregate materials for both Rice Creek Commons as well as <br />the Primer Tracer development. <br />Pride in Ownership <br />We think that it’s natural for a city to get nervous when a developer requests Industrial Zoning with a <br />component of Exterior Storage. Bolander has been in our current location in St Paul since 1980. We <br />have 8 acres near the intersection of Plato Boulevard and Wabasha Street. We have a great relationship <br />with the City of St Paul and have never had a complaint about our office, shop or yard that I can <br />remember in my 23 years with the company. <br />In our site planning and development process, we will work closely with our designers and Arden Hills to <br />ensure that there is proper screening for elements of the site that we want to keep invisible to the <br />public. This site is really perfect for I-2 Zoning. It has a naturally occurring wetland to the south as well <br />as the National Guard property to the north. It is already almost invisible from every direction. <br />We look forward to hearing your thoughts about our preliminary proposal. <br />Sincerely, <br />Mark Ryan
The URL can be used to link to this page
Your browser does not support the video tag.