Laserfiche WebLink
Section <br />5.0 ENGINEER’S COST ESTIMATES 5.0 <br /> <br />BSI has prepared a cost estimate for the City to use for budgeting purposes. Due to <br />the age of the coating and the percentage of coating failure, the tower should be fully <br />reconditioned in the next 1 to 2 years. <br /> <br />The following cost estimate is based on a construction schedule of 4 weeks. An <br />updated Engineer’s Cost Estimate should be obtained within 12 months prior to <br />bidding the project. <br /> <br />5.1 Interior Wet Structural Repairs <br /> <br />5.2 Interior Wet Coating – Spot Repair <br />Type of Coating – Zinc/Epoxy/Epoxy System <br /> <br />5.3 Interior Dry Structural Repairs <br /> <br />5.4 Interior Dry – Spot Repair <br />Type of Coating – Zinc/Epoxy/Epoxy System <br /> <br />5.5 Grid bee GS-9 Mixer <br /> <br />5.6 Exterior Structural Repairs <br />$ 7,700 <br /> <br />$ 63,500 <br /> <br /> <br />$ 2,000 <br /> <br />$ 85,000 <br /> <br /> <br />$ 25,000 <br /> <br />$ 5,000 <br /> <br />5.7 Exterior Coating - Repairs $ N/A <br />Type of Coating – Zinc/Epoxy/Urethane/Fluoropolymer System <br /> <br />5.8 Exterior Logo <br /> <br />5.9 Mobilization <br /> <br />6.0 Engineering Specifications <br /> <br />6.1 Inspection Fee <br /> <br />6.2 2-Year Warranty <br /> <br />6.3 Estimated Total Cost <br />$ N/A <br /> <br />$ 20,000 <br /> <br />$ 15,000 <br /> <br />$ 25,200 <br /> <br />$ 4,000 <br /> <br />$ 225,400 <br /> <br />Badger State Inspection, Inc. <br />Report prepared and certified by: <br />Robert E. Kollmer <br />NACE Certified Coatings Inspector No. 1291 <br /> <br /> <br />12