Laserfiche WebLink
City of Arden Hills <br />Proposal QTB182726 <br />August 17, 2023 <br />Page 2 <br />representative. After reviewing available information to determine compliance with project plans and/or <br />specifications and other design or construction documents, our scope of services for the project will be <br />limited to the tasks defined below. <br />Soil Related Services <br />■ Measure the in -place dry density, moisture content and relative compaction of fill placed for <br />pavement and/or utility support, and of utility backfill for compliance with the project <br />documents. This task includes performing laboratory Proctor tests to provide maximum dry <br />densities from which the relative compaction of fill can be determined, as well as the use of a <br />nuclear density gauge to measure in -place dry densities and moisture contents. <br />■ Sample and test aggregate base materials for compliance with the project documents. This <br />task includes laboratory gradation testing of aggregate base material. <br />■ Perform MnDOT dynamic cone penetrometer (DCP) tests on aggregate base material. <br />Concrete Related Services <br />■ Sample and test fresh concrete associated with pavement and/or curb -and -gutter for <br />compliance with the project documents, and cast test cylinders for laboratory compressive <br />strength testing. We assume that we will be able to appropriately dispose of excess concrete <br />(and associated wash water) on site at no additional cost to us. <br />Measure and report the compressive strength of the concrete test cylinders for compliance <br />with the project documents. A set of three cylinders will be tested at 28 days for each set <br />cast. If field cure cylinders are requested, each additional cylinder will be charged at the unit <br />price listed in our cost estimate. <br />Bituminous Related Services <br />■ Sample and test bituminous pavement materials for compliance with the project documents. <br />This task includes rice specific gravity, gyratory density, asphalt content, and extracted <br />aggregate gradation tests of the bituminous. <br />■ Measure the in -place density of the fresh bituminous with a nuclear density gauge to <br />observe and document the contractor's roll pattern. <br />Consulting, Project Communication and Reporting Services <br />■ Project management, including scheduling of our field personnel. <br />■ Review test reports, and communicating with you and the parties you may designate such as <br />the project contractor(s), and other project team members, as needed. <br />■ Transmit test results to the project team on a weekly basis. <br />BRAUN <br />INTERTEC <br />