My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80-060
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
1980-1989
>
1980
>
80-060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:07:20 PM
Creation date
11/13/2006 3:41:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. '. <br /> <br />Resolution No. 80-60 <br />continued <br />Page h'Jo <br /> <br />Chl <br /> <br />Inl <br /> <br />In addl.tlon to tha above fees, I'll ~ transformers <br />and generators for lIght, heat and power shaijl <br />be computed separately at $4.00 per unit pius 20~ <br />per KVA up to and Includlng-rDO KVA. 10! KVA -- <br />and over at i5~ per KVA. The maximum fee for <br />any transformer or generator In this category <br />is $40.00. <br />In addition to the above fees, all transformers <br />for signs and outline ~Ightlng shall be computed <br />at $3.00 for the first 500 VA or fractIon thereof <br />per unit, plus 30e for each additional 100 VA <br />or traction thereof. <br />In addition to the above fees (unless Included <br />In the maximum fee fl led by the Inltia! Installar) <br />remo.~e contr, , signal ci rcults and cl rcults of less <br />than 50 volts shall be computed at $~ per each <br />ten openings or devIces ot each system plus $~ <br />for each addltlona! ten or fraction thereot. <br />'For the review of plans and. specIfications of pro- <br />posed Installations, there shall be a minimum fee <br />of $100.00 up to and Including $30,000 of electrIcal <br />estimate, pius illO of 1% on,any amount In excess of <br />$30,000 to be paid by parsons or firms requesting <br />the revIew. <br />When re-Inspectlon Is necessary to determine whether <br />unsafe conditions have been corrected and such <br />conditions are noisubject of an appeal pending <br />before any court, a re-Inspectlon fee of $~ may <br />be assessed In writing by the Inspector. <br />For Inspections not covered hareln, or for requested <br />spectaR Inspectlon~ or services, the fee shall be <br />$14.00 par man hour, Including travel time, plus i6~ <br />per mile traveled, pius the reasonab~e cost of eqUfp- <br />ment or material consumed. This section Is also appll~ <br />cable In InspectIon of empty conduits and such Jobs <br />as,detarmlned by the cIty. <br />For Inspection of transient projects !nciudlng but <br />riot limited to carnlvaDs and ~Ircuses the Inspection <br />fees shall be computed as fOlOol1s: <br /> <br />(I) <br /> <br />, <br /> <br />Ij) <br /> <br />Ckl <br /> <br />CIl <br /> <br />lml <br /> <br />'. <br /> <br />Power supply units accordIng to Item Cbl of the Fee <br />Schedule., A like fae will be required on power suppDy <br />units at each engagement during the season, except <br />that a fee of $14.00 per hour will be charged for <br />addltlonal,tlme spent by i"he Inspector, If i-he powsr <br />supp I y Is not ready for inspect I on at the t! me and <br />date specified on the request for Inspection as re- <br />quired by law. <br /> <br />Rides, Devices or Concessions: Shat I be Inspected at <br />thalr first appearance of the season and the InspectIon <br />fee sha I Ibe $!hQQ. pe r unit. <br /> <br />Passed by the Arden HIlls City Councl I this 8th day of December. <br /> <br />1980, <br /> <br />{~4t~~ <br /> <br />Actl ng Mayor <br /> <br />~inYf1("L <br /> <br />Charlotte ~4c lash <br />Clerk Administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.